Installation & Servicing instructions ATAG iC-Range
12
8 Mounting boiler frame
Install the boiler in a boiler room in accordance to the actual local regulations BS5440-2:2009.
The installation location of the boiler has to be, and remain, frost-free. The boiler casing is splash water tight
(IPX4D) and is suitable to be installed in e.g. a bathroom.
It is NOT necessary to have a purpose provided air vent in the room or internal space in which the boiler is
installed. Neither is it necessary to ventilate a cupboard or compartment in which the boiler is installed, due
to the extremely low surface temperature of the boiler casing during operation. Therefore the requirements of
BS5440:2 may be disregarded.
The boiler can be mounted practically to any wall with the wall frame and the enclosed fi xing equipment. The
wall must be fl at and of suffi cient strength in order to be able to carry the boiler weight with its water content.
Above the boiler there must be at least 210 mm working space in order to be able to fi t a horizontal
concentric fl ue system to the rear (See chapter 9.8 for more fl ue options). Make sure there is suffi cient
service space around the boiler according fi gure 8.a. The location of the boiler can be determined by using
the template.
The wall frame allows the possibility to pre-fi t the complete heating and DHW system before fi tting the boiler.
Also the fl ue system can be prepared. Finally fi tting of the fl ue system is done after fi tting the boiler. See next
page for all options for connection the heating, DHW, condensate, fl ue and gas installation.
Before hanging the boiler to the boiler frame remove the front panel of the boiler fi rst. The front panel is also
the air cabinet and is attached to the boiler case with 2 fasteners (A and B) (see fi gure 8.a).
Note that there is an earth cable (when present) to disconnect when removing the boiler front panel.
Free space for removing the connector is about 400 mm. Remember to connect this earth cable
(when present) when placing back the boiler front panel and take care the wire does not get stuck
between front panel and boiler. Always replace and turn the 2 screws tight in the fasteners A and B.
See chapter 9.8 for further procedure to fi t the boiler onto the boiler frame.
Service dimensions (in mm)
Figure 8.a
Содержание iC 24
Страница 33: ...Installation Servicing instructions ATAG iC Range 33 Figure 10 7 a 10 9 Electrical diagram...
Страница 56: ...Installation Servicing instructions ATAG iC Range 56 Annex C Short parts list...
Страница 57: ...Installation Servicing instructions ATAG iC Range 57...
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......