Installation and Operation
74
8.7
Battery Hanger Module Operation and Installation
8.7.1 Batter Hanger Module BHM-2
Mounting BHM-2 to TST / BST
1. Unlock and open the Top / Bottom Stage clamp mechanism.
2. Align the Battery Hanger Module dovetail with the Top / Bottom
Stage mount.
3. Lift the Battery Hanger Module completely into the Top / Bottom
Stage.
4. Lock the dovetail clamp mechanism.
8.7.2 Mounting ø19mm Rods
1. Turn both Rod Clamp wing nuts to the left to open the
clamp mechanism.
2. Insert the 19mm rods.
3. Tighten both rod clamp wing nuts.
ATTENTION
Do not over tighten, when using carbon fiber rods.
Mounting the hinge and the short ø 19mm rods
1. Alling the long 19mm rods.
2. Open both wing nuts.
3. Place the hinge on the long ø19mm rods.
Tighten the wing nuts.
4. Open the clamp screws.
5. Place the short ø19mm rods.
Tighten the clamp screws.
ATTENTION
Do not over tighten, when using carbon fiber rods.
Содержание ARTEMIS 2
Страница 1: ...TRINITY 2 System U S E R M AN U A L 01 09 2022 ...
Страница 6: ...Content 6 10 Transportation and Storage 89 11 Disposal 90 12 ARRI Service Contacts 91 13 Appendix 93 ...
Страница 10: ...About the product 10 TRINITY Head 2 TRH 2 ...
Страница 18: ...About the product 18 5 4 Pin Out ARTEMIS 2 TRINITY 2 ...
Страница 25: ...Overview 25 7 Overview ...
Страница 26: ...Overview 26 7 1 TRINITY 2 Head Overview Front right view ...
Страница 27: ...Overview 27 Back left view ...
Страница 28: ...Overview 28 Junction Box right side Junction Box left side ...
Страница 29: ...Overview 29 Front panel Panel Right Panel Back ...
Страница 34: ...Overview 34 ...
Страница 35: ...Overview 35 7 4 Master Grip Overview ...
Страница 40: ...Overview 40 7 6 Top Stage and Bottom Stage Overview ...
Страница 45: ...Overview 45 7 8 Battery Mounting System Overview ...