Installation and Operation
68
8.5
RCP-3 Installation and Operation
8.5.1 RCP-3 Installation
Mounting the Rod Clamp Bridge
vertical
1. Open the rod clamp wing nut by
turning it counterclockwise.
2. If necessary, move the top screw to the middle hole.
Pushing away the clamping slide makes it easier to move the
screws.
3. Tighten both screws.
Mounting the Rod Clamp Bridge
horizontal
1. Open the rod clamp wing nut by
turning it counterclockwise
2. If necessary, move the top screw to the lower hole.
Pushing away the clamping slide makes it easier to move the
screws.
3. Tighten both screws.
8.5.2 Power ON / OFF
To turn the RCP-3
ON
and
OFF
, press and hold down the Jog-
Wheel until the ARRI logo appears on the display.
Содержание ARTEMIS 2
Страница 1: ...TRINITY 2 System U S E R M AN U A L 01 09 2022 ...
Страница 6: ...Content 6 10 Transportation and Storage 89 11 Disposal 90 12 ARRI Service Contacts 91 13 Appendix 93 ...
Страница 10: ...About the product 10 TRINITY Head 2 TRH 2 ...
Страница 18: ...About the product 18 5 4 Pin Out ARTEMIS 2 TRINITY 2 ...
Страница 25: ...Overview 25 7 Overview ...
Страница 26: ...Overview 26 7 1 TRINITY 2 Head Overview Front right view ...
Страница 27: ...Overview 27 Back left view ...
Страница 28: ...Overview 28 Junction Box right side Junction Box left side ...
Страница 29: ...Overview 29 Front panel Panel Right Panel Back ...
Страница 34: ...Overview 34 ...
Страница 35: ...Overview 35 7 4 Master Grip Overview ...
Страница 40: ...Overview 40 7 6 Top Stage and Bottom Stage Overview ...
Страница 45: ...Overview 45 7 8 Battery Mounting System Overview ...