![ARRI ARTEMIS 2 Скачать руководство пользователя страница 76](http://html.mh-extra.com/html/arri/artemis-2/artemis-2_user-manual_2975796076.webp)
Installation and Operation
76
Free Positioning of the Battery Mounts
The combination of the BHM, which is equipped with 19 mm rods, and the freely positionable battery
system allows the size and weight distribution of the counterweight in the lower slide to be designed in
an unprecedented way.
8.7.5 Connecting the Battery Mounts to the Battery Hanger Module
The battery mounts BMS-1 & BMS-2 are equipped with a LEMO90° elbow connectors.
In order to give you more flexibility when placing the battery mounts, the three Battery In sockets can be
rotated by 90° and the elbow plug can be placed in the required position.
Right side
BAT IN 1
and
BAT IN 3
can be brought into the desired
position by turning the sockets 90° around below.
ADVICE
Do
not
turn the
Bat In
sockets
upside down
.
Only
turn the sockets around
underneath!
Содержание ARTEMIS 2
Страница 1: ...TRINITY 2 System U S E R M AN U A L 01 09 2022 ...
Страница 6: ...Content 6 10 Transportation and Storage 89 11 Disposal 90 12 ARRI Service Contacts 91 13 Appendix 93 ...
Страница 10: ...About the product 10 TRINITY Head 2 TRH 2 ...
Страница 18: ...About the product 18 5 4 Pin Out ARTEMIS 2 TRINITY 2 ...
Страница 25: ...Overview 25 7 Overview ...
Страница 26: ...Overview 26 7 1 TRINITY 2 Head Overview Front right view ...
Страница 27: ...Overview 27 Back left view ...
Страница 28: ...Overview 28 Junction Box right side Junction Box left side ...
Страница 29: ...Overview 29 Front panel Panel Right Panel Back ...
Страница 34: ...Overview 34 ...
Страница 35: ...Overview 35 7 4 Master Grip Overview ...
Страница 40: ...Overview 40 7 6 Top Stage and Bottom Stage Overview ...
Страница 45: ...Overview 45 7 8 Battery Mounting System Overview ...