![ARRI ARTEMIS 2 Скачать руководство пользователя страница 77](http://html.mh-extra.com/html/arri/artemis-2/artemis-2_user-manual_2975796077.webp)
Installation and Operation
77
Left Side
Same procedure with the
BAT IN 2
.
ADVICE
Do
not
turn the
POWER OUT
Socket!
This socket is fixed and cannot be rotated.
8.7.6 Connecting the Battery Hanger Module to the Top / Bottom Stage
The
POWER OUT
socket of the Battery Hanger provides high capacity 12V and 24V power,
plus digital battery communication to the artemis and TRINITY system as soon the BHM-2
is connected to the Top Stage (TST) or Bottom Stage (BST).
ATTENTION
Hot Plug
Check that the BHM is switched
OFF
before connecting it to the TST / BST.
Connecting an operating BHM to the system, may produce an unwanted electrical surge!
Connect the Power Cable, BHM-2 to TST (K2.0037771)
to the
POWER OUT
socket of the
Battery Hanger Module and the
POWER IN
socket of the Top / Bottom Stage.
8.7.7 Power ON / OFF
To turn the BHM-2 / the entire system
ON
and
OFF
,
press and hold
down the Jog-Wheel until the ARRI logo appears on the display.
Содержание ARTEMIS 2
Страница 1: ...TRINITY 2 System U S E R M AN U A L 01 09 2022 ...
Страница 6: ...Content 6 10 Transportation and Storage 89 11 Disposal 90 12 ARRI Service Contacts 91 13 Appendix 93 ...
Страница 10: ...About the product 10 TRINITY Head 2 TRH 2 ...
Страница 18: ...About the product 18 5 4 Pin Out ARTEMIS 2 TRINITY 2 ...
Страница 25: ...Overview 25 7 Overview ...
Страница 26: ...Overview 26 7 1 TRINITY 2 Head Overview Front right view ...
Страница 27: ...Overview 27 Back left view ...
Страница 28: ...Overview 28 Junction Box right side Junction Box left side ...
Страница 29: ...Overview 29 Front panel Panel Right Panel Back ...
Страница 34: ...Overview 34 ...
Страница 35: ...Overview 35 7 4 Master Grip Overview ...
Страница 40: ...Overview 40 7 6 Top Stage and Bottom Stage Overview ...
Страница 45: ...Overview 45 7 8 Battery Mounting System Overview ...