11
Assembling Step
Connect the machine Base to the Ground:
Step 7: Fix each Side Board onto the frame leg by screws;
Step 8: Adjust the
[
Level Bolts] according to the measurement of Level Gauge, to make sure:
a
-
the Water Table level; b
-
the 2 track on same horizontal level [The level precision request:
±
1mm
]
Step 9: Fix all the screws( Fix Bolt) to the Ex-
pansion Bolt tightly.