AQUAKOND AKY
CONDENSING BOILER
24
code HC0048.10GB ed.B-1811
AKY
H
C
00
47
C
2
01
6_
A
Included with the boiler
Fitted directly on the boiler
To be provided by the installer
Fuel cut-off valve - optional -
C09073
AKY050/070/100 installation diagram
Ministerial Decree 1-12-75 and the corresponding technical specifications ["R" collection ed. 2009]
require, for boilers
having burner heat output greater than 35 kW, the installation of the fuel cut-off valve with manual reset. Apen Group
supplies AKY050/070 boilers with the well to insert the sensitive component and, on request, with C09073 kit.
N
ote: The antifreeze function of the CPU-SMART PCB (parameter D8=1) that prevents the triggering of the
element sensitive to the temperatures below zero degrees is already activated by default.
KEY
1 Main burner gas solenoid valve
2 Pressure stabiliser
3 Safety gas solenoid valve
4 Gas filter - (with small section, installed in the gas valve)
5 Gas tap (supplied by APEN GROUP)
6 Anti-vibration joint
7 Gas filter
8 Fuel cut-off valve
AKY032/034 installation diagram
Included with the boiler
Fitted directly on the boiler
To be provided by the
installer
5.6. GAS Connections
According to the current standards UNI-CIG, carry out the line for gas supply; for gas line connections, use CE certified components only.
AKY boilers are supplied with:
•
Dual gas valve;
•
Gas stabiliser;
•
Gas tap;
All components, except for the tap, are fitted inside the boiler;
To complete the installation, as required by the current regulations, the following components must be fitted:
•
Anti-vibration joint;
•
Gas filter [without stabiliser].
N