
5-5
Operational Test
Uncrating/Installation Instructions
P-920012-041
1. Lock unit electrical disconnect switch to OFF position.
2. Position Main Power switch (located outside Electrical supply
box) to OFF and position Printer
POWER OFF/STANDBY
switch
to OFF.
3. Open Control front panel.
4. Using one hand to support the control assembly, remove the two
hex socket screws (upper right and upper left) holding it in place.
5. Carefully lower control assembly forward and downward until unit
stops in a horizontal position. Stops are provided to support the
control in position.
6. Locate dip switch SW1 on Control PC Board (see Figure 5-2).
7. Make the appropriate settings on the DIP switches. See Table
5-1.
» Dip Switches Settings
Table 5-1. Dip Switches Settings
Control PC Board
Dip
Switch
Setting
1
OFF
2
OFF
3
OFF
4
OFF
5
OFF
ON
(Indep. Cycle Monitor Alarm
Messages Activated)
OFF
(Indep. Cycle Monitor Alarm
Messages Deactivated)
N.B.
Default Dip Switch Set-
tings: 1-2-3-4-5 = OFF
6 = ON
6
Содержание RELIANCE 444 HTM
Страница 6: ...iv P 920012 041 Uncrating Installation Instructions This Page Intentionally Left Blank ...
Страница 8: ...vi P 920012 041 Uncrating Installation Instructions This Page Intentionally Left Blank ...
Страница 14: ...2 2 P 920012 041 Uncrating InstallationInstructions Uncrating Instructions Figure 2 1 Crate Tip Indicator ...
Страница 20: ...2 8 P 920012 041 Uncrating InstallationInstructions Uncrating Instructions This Page Intentionally Left Blank ...
Страница 36: ...5 8 P 920012 041 Uncrating Installation Instructions Operational Test This Page Intentionally Left Blank ...