3-5
Installation Instructions
Uncrating/Installation Instructions
P-920012-041
1. Make sure unit is placed, as shown on Equipment Drawing, in
correct relation to building supply lines. If unit is not at installation
site, refer to Uncrating Instructions (Section 2) for proper moving
instructions.
2. Check that unit is level.
a. Place a spirit level on loading rack inside wash chamber.
b. Level unit, end-to-end and side-to-side, using leveling legs
located at base of unit.
3. Once unit is level, it can be secured to floor. Install anchoring pins
into four internal corners at base of unit.
4. Open lower service access door.
5. Remove bolt, located on bottom left-hand side of unit, securing
contactor box to unit frame.
6. Pivot contactor box outward to access the lower utility connec-
tions (see Figure 2-2).
NOTE: For better access, disconnect electrical connections from
contactor box, lift box off hinges, and set aside.
7. Connect the following building supply lines to the unit (see Figure
3-1 ).
• DRAIN - Connect building waste line to unit drain line, accessible
from lower service compartment.
• HOT WATER - Blow out the building hot water supply line to
remove chips, scale, etc. Connect line to unit connection.
NOTE: Water is hot; run water line to a safe sink or drain.
• COLD WATER - Blow out the building cold water supply line to
remove chips, scale, etc. Connect line to unit connection.
• STEAM (required on Steam-Heated units only) - Blow out the
building steam supply line to remove chips, scale, etc. Connect
line to unit connection.
NOTE: Live steam; run steam line to a safe drain.
• CONDENSATE RETURN (required on Steam-Heated units
only) - Connect building condensate return line to unit
connection. Condensate return must be vented and non-
pressurized.
• VENT - Connect building ventilation system to unit vent
connection.
• PURE WATER - Connect building supply line to unit connection.
• AIR - Connect building supply line to unit connection.
• ELECTRICITY - Connect building electrical supply to unit
electrical supply box. Verify tight electrical connections.
8. Open building supply valves and check for leaks. Correct if
necessary.
Connect Utilities
CAUTION: After utilities are con-
nected to unit, slowly remove the
protective adhesive paper from the
exterior cabinet panels to reduce
the level of static discharge.
CAUTION: When removing adhe-
sives from stainless steel, use a
small amount of non-flammable
cleaning solvent. Rub in a back-
and-forth motion (in same direc-
tion as surface grain). Solvent
rubbed in a circular motion or ap-
plied with a wire brush or steel
wool on door and chamber assem-
blies can be harmful to stainless
steel. Do not use solvents on
painted surfaces.
Содержание RELIANCE 444 HTM
Страница 6: ...iv P 920012 041 Uncrating Installation Instructions This Page Intentionally Left Blank ...
Страница 8: ...vi P 920012 041 Uncrating Installation Instructions This Page Intentionally Left Blank ...
Страница 14: ...2 2 P 920012 041 Uncrating InstallationInstructions Uncrating Instructions Figure 2 1 Crate Tip Indicator ...
Страница 20: ...2 8 P 920012 041 Uncrating InstallationInstructions Uncrating Instructions This Page Intentionally Left Blank ...
Страница 36: ...5 8 P 920012 041 Uncrating Installation Instructions Operational Test This Page Intentionally Left Blank ...