5-8 | Thermox WDG-V / VC / VCM with Blow Back
Process Pressure Checks (Only if above 2 psig)
To check that you entered the process pressure correctly, select
Process Pressure
from the
configuration menu
. Also ensure that the calibration process pressure equals normal operat-
ing process pressure. Calibration should only be performed under these conditions for highest
accuracy.
Cell Checks
If the cell fails when you first begin
to use the analyzer:
It is likely that there is a leak in the sensor plumbing
or an improper calibration gas setup, and there is not
a problem with the cell itself (see the “Leak Check”
section later in this chapter for help on how to check
for leaks; see the “Calibration/Aspirator Air Checks”
section earlier in this chapter for help on checking
your calibration gas setup).
If the analyzer has been operating
for some time and you feel the oxy-
gen reading is inaccurate:
First check by running a known calibration gas to veri
-
fy the analyzer’s response. If the analyzer responds to
the calibration gas correctly, it indicates either leaking
or plugged plumbing.
If your analyzer doesn’t respond
properly to the calibration gas:
This may indicate a problem with the cell. Before re
-
placing the cell, check for leaks or plugged plumbing.
Содержание Thermox WDG-V
Страница 8: ...viii Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Страница 16: ...xvi Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Страница 22: ...1 6 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Страница 34: ...2 12 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Страница 57: ...Installation Guide 3 17 Figure 3 18 RCU flow diagram 3 Span Combustibles and Methane...
Страница 58: ...3 18 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Страница 64: ...3 24 Thermox WDG V VC VCM with Blow Back Figure 3 20 Wiring...
Страница 73: ...AMEVision Display User Interface or Communications 4 5...
Страница 76: ...4 8 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Страница 88: ...5 12 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Страница 91: ...Service and Parts 6 3 Figure 8 1a Wiring diagram for sensor...
Страница 96: ...6 8 Thermox WDG V VC VCM with Blow Back Figure 8 3 Thermocouple replacement...
Страница 100: ...6 12 Thermox WDG V VC VCM with Blow Back Figure 8 5 Flow sensor replacement...
Страница 103: ...Service and Parts 6 15 Figure 8 7 Box Heater Replacement...
Страница 105: ...Service and Parts 6 17 Figure 8 8 Combustible Block Heater Replacement...
Страница 107: ...Service and Parts 6 19 Figure 8 9 Electronics Board Removal...
Страница 114: ...7 4 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Страница 118: ...A 4 Thermox WDG V Series Analyzers This page intentionally left blank...
Страница 126: ...A 12 Thermox WDG V Series Analyzers This page intentionally left blank...
Страница 132: ...A 18 Thermox WDG V Series Analyzers This page intentionally left blank...
Страница 137: ...PC Configurator Software A 23 Figure 23 Calibration_Calibration Results screen...
Страница 138: ...A 24 Thermox WDG V Series Analyzers This page intentionally left blank...
Страница 144: ...A 30 Thermox WDG V Series Analyzers This page intentionally left blank...
Страница 156: ...A 42 Thermox WDG V Series Analyzers This page intentionally left blank...
Страница 164: ...A 8 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...