M470039-01 REV-F
Page 155
APPENDIX C: PV SWEEP - PC Software Guide
Start Program
When click on the icon, an interface selection window is pop-up to select communication interface between
PC and device. Please turn the knob to select interface, and change the interface parameters, and click the
button to launch interface communication.
If interface successfully connect to eLoad device, control panel will pop-up for operation.
Access Control Panel
When interface successfully connect to device, a control panel will be displayed on the windows desktop.
Note:
For Solar PV testing, please use PV Mode
Sweep Operation & Data Capture
To start sweep operation, select sweep mode on
control, input sweep test case by entering
specified values in
Start (Voltage)
,
Stop (Voltage)
,
Step (1mV ~ Vmax range)
, and
Time (100ms ~ 60s
range)
control fields. The Step and Time parameters will configure the voltage increment and sampling time at
PV SWEEP & PV OPERATION GUIDE
Revision History
First release 1.0
Содержание Amrel PLA 2U
Страница 2: ......
Страница 4: ...M470039 01 REV F Page 3 This is page intentionally left blank...
Страница 6: ...M470039 01 REV F Page 5 This page intentionally left blank...
Страница 8: ...M470039 01 REV F Page 7 This page intentionally left blank...
Страница 132: ...M470039 01 REV F Page 131 SEVEN SPECIFICATIONAND POWER CURVE COMMON SPECIFICATIONS...
Страница 141: ...M470039 01 REV F Page 140...
Страница 145: ...M470039 01 REV F Page 144 2 Unplug the 12VDC connector 4 pin remove the hexagonal nut and take off the coil assembly...
Страница 146: ...M470039 01 REV F Page 145 3 Remove the 4 screws securing the solenoid and take off the solenoid assembly...
Страница 152: ...M470039 01 REV F Page 151 6 OUTLET BOTTOM interconnect pipe x 1pcs 7 Plastic Round Shim ID OD 0 003 Thick x 4 pcs...
Страница 161: ......
Страница 162: ......