Installation Guide
4 - 1
Thermal Imaging System
NIR-B Borescope
Electrical Auto Retract
WARNING
Make sure that the base frame is fully supported during installation.
Metallic surfaces may become hot (over 73 °C / 163 °F) during
installation. Ensure that the correct Personal Protection Equipment (PPE)
is worn).
The AR must be supported so that:
•
The borescope aligns with the furnace hole and does not protrude from the
furnace insulation (see installation drawing sheet 8)
•
The AR can be fixed to the front and rear supports using the front and rear axis
support brackets provided.
•
The front support is seated close enough to the furnace wall to allow the port seal
to mate to walls surface (see installation drawing sheet 2)
•
The weight of the system is supported at the front and rear using the front and
rear installation points at the required angle [Max 30⁰] (see installation drawing
sheet 1)
•
Free movement of the water pipes and electrical cables is allowed as the Auto
Retract System operates (see installation drawing sheet 1)
NOTE
When manufacturing the frame, it is highly recommended that its height in
each corner can be adjusted
in situ
in order to help with final alignment.
MANUFACTURE OF A
BASE FRAME
4