29
98-0156 Rev G
Refer to Section 6.10 for SYSTEM
SETUP PAGE 2 values.
TANK PRE-HEAT TIME
is the allotted
time for the tank to heat up to the Tank
Pre-Heat Temp.
LOOP PRE-HEAT TIME
is the allotted
time for the loop to heat up to the
Sanitization Temp.
DRAW OFF TIME
is the minimum time
for draw off to occur, which allows
disinfection of dialysis machines and
the connecting lines.
COOL DOWN TIME
is the minimum
time for the loop and tank to cool
down.
Press
“NEXT PAGE”
to enter
SYSTEM
SETUP PAGE 3.
In this final set up screen you will be
able to change the date and time
settings, by pressing
“CLOCK
SETTINGS”
. This will take you to
TIME
SETTING AND DISPLAY
screen. The
clock is a 24hr clock. The date is
displayed as mm/dd/yyyy. Press X in
the upper right corner of the window
when finished.
If the unit is coupled to a MediQA or
MROZ unit select “
INTERFACE
CONTROL
”.
This instructs the unit that
the Heatsan will control the initiation
of
the
Heatsan process.
To initiate this
change you have to press and hold the
button for 5 seconds.
Содержание Heatsan 00HS208
Страница 51: ...50 98 0156 Rev G Heatsan Process Flow Diagram ...
Страница 52: ...51 98 0156 Rev G Wiring Diagrams ...
Страница 53: ...52 98 0156 Rev G ...
Страница 54: ...53 98 0156 Rev G ...
Страница 55: ...54 98 0156 Rev G ...
Страница 56: ...55 98 0156 Rev G ...
Страница 57: ...56 98 0156 Rev G ...
Страница 58: ...57 98 0156 Rev G Installation Layout Water Connection Detail ...
Страница 62: ...61 98 0156 Rev G Tubing with Heatsan and MediQA Hidden ...
Страница 64: ...63 98 0156 Rev G RO Divert Valve and Heatsan Divert Valve 1 Heatsan Divert Valve 2 ...
Страница 65: ...64 98 0156 Rev G Heatsan Discharge Solenoid SV3A NC Heatsan Fill Solenoid SV3B NO ...
Страница 70: ...69 98 0156 Rev G ...