
38
American Dryer Corp.
113406-1
B. ADJUSTMENTS
7 DAYS AFTER INSTALLATION AND EVERY 6 MONTHS THEREAFTER
Inspect bolts, nuts, screws, setscrews, grounding connections, and nonpermanent gas connections (unions, shutoff
valves, and orifices). Fan (impellor) V-belts, along with the motor and drive belts
should be
examined and
replaced if necessary. Cracked or seriously frayed belts
should be
replaced. Tighten loose V-belts when
necessary. Complete operational check of controls and valves. Complete operational check of
ALL
safety
devices (door switches, lint drawer switch, sail switch, burner, and hi-limit thermostats).
NOTE:
Squirrel cage type fan (impellor) on the blower motor
must be
inspected and cleaned every 6
months.
C. LUBRICATION
The fan shaft bearings and
ALL
the basket (tumbler) drive shaft and idler shaft bearings
must be
lubricated
every 3 months. Use Shell Alvania #2 grease or its equivalent. Lubrication is necessary or premature bearing
failure will be the result.
The motor bearings are permanently lubricated and
DO NOT
require to be serviced.
Содержание ML-175
Страница 54: ...ADC113406 1 01 07 05 3 ...