42
B. ADJUSTMENTS
7 DAYS AFTER INSTALLATION AND EVERY 6 MONTHS THEREAFTER
Inspect bolts, nuts, screws, (bearing setscrews), grounding connections, and nonpermanent gas connections
(i.e., unions, shutoff valves, and orifices). Motor and drive belts
should be
examined. Cracked or seriously
frayed belts
should be
replaced. Tighten loose V-belts when necessary. Complete operational check of
controls and valves. Complete operational check of
ALL
safety devices (i.e., door switch, lint drawer switch,
sail switch, burner and hi-limit thermostat).
C. LUBRICATION
The drive shaft bearings and idler shaft bearings
should be
lubricated every 3 months. Use a #2 grease or its
equivalent. Lubrication is necessary.
Содержание Gas/HSI & Steam ID-120
Страница 54: ...ADC113330 1 08 31 01 25 ...