![American Changer AC2002 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/american-changer/ac2002/ac2002_operation-manual_2922520006.webp)
6
9.
Choose a height to mount the changer, keeping in mind that a handicapped person in a
wheelchair should still be able to insert a bill into the bill validator. (We recommend no
higher than 4 feet above the ground.)
10.
Have someone hold the changer against the wall while someone else marks the holes.
CAUTION:
THE CHANGER WEIGHS 98 POUNDS; DO NOT EXERT YOURSELF SO
THAT YOU MAY CAUSE AN INJURY.
11.
BEFORE DRILLING THE MARKED HOLES, ENSURE THAT THERE ARE NO
ELECTRICAL WIRES, TELEPHONE LINES, GAS OR WATER LINES BEHIND THE
WALL.
12.
Hold the changer’s back against the wall. Thread and tighten bolts.
13.
Verify that the machine is securely mounted.
14.
If the changer is permanently connected through a conduit, proceed to step #16.
15.
Feed the AC line cord out the bottom or the back of the changer by moving the “L” bracket
if necessary, and then perform the following:
a. Plug the male end into the AC wall outlet.
Do not use an extension cord unless
allowed by the building electrical code
.
b.
Important:
Attach the line cord clamp to the line cord. Verify it is at the right length
and that the line cord is not rubbing against any sharp edges or is being strained in
any way. Then mount the line cord clamp to the studs at the hole. Tighten securely.
Installation is completed. Proceed to the “Filling the Hoppers” section.
16. In order to continue, you will need to purchase electrical cable conduit, a standard 3-
prong AC wall outlet, and 12-gauge wire. We highly recommend hiring a licensed
electrician to perform the following:
a. Install the conduit box on the conduit entering the cabinet in the lower right side of
the cabinet.
b. Secure the 3 wires (hot, neutral and ground) to the AC wall outlet; the ground wire
should also be directly attached to the cabinet ground terminal.
c. Plug the male end into the AC outlet just installed.
d. Properly fold the line cord to avoid sharp corners and any other damage.
17. Proceed to the “Filling the Hoppers” section.
Filling the Hoppers
When each hopper has fewer than 80-100 coins left, the red “Empty” LED will illuminate on
the front of the changer. If you have disconnected your LED, make sure the orange wire is
going to the terminal on the LED that has the red wired terminal.
Whenever the “Empty”
LED is “ON,” the validator is disabled; and it will no longer accept bills.
1.
Turn OFF the power on the Main Logic Board.
2.
Slide the hoppers from the cabinet, and insert the coins through the opening on the top.
There must be at least enough coins to cover the two gold plates at the bottom of the
hoppers
(
somewhere between 160 and 1,600 coins, minimum to maximum
).
3.
Slide the hoppers back into the hopper plate.
Do not use excessive force!
4.
Turn the power switch to “ON.” The “Empty” LED is now off, and the bill validator is ready
to accept bills.
Содержание AC2002
Страница 8: ...8 HOPPER PAYOUT TABLE...
Страница 9: ...9...
Страница 16: ...16 Dual Hopper Schematics...
Страница 17: ...17...
Страница 18: ...18...
Страница 19: ...19...