16. Pull off the bearing cover
1
.
17.
When the hopper is closed off with the sliding
shutter,
pull the metering roller
2
out of the metering
unit.
18. Install the new metering roller.
1
2
CMS-I-00002500
19. Align the catch
3
on the bearing cover
2
with
the drive shaft.
20. Install the bearing cover.
21. Tighten the bolts with the wrench
1
.
22. Park the wrench in the holder
4
.
1
4
2
3
CMS-I-00002504
23. Park the sliding shutter
1
on the metering
housing.
24. Swivel the bolts
2
in front of the sliding shutter.
25. Tighten the bolts with the wrench
3
.
2
3
1
CMS-I-00002503
6 | Preparing the machine
Preparing the implement for operation
MG6492-EN-II | G.1 | 26.04.2021
66