
Electrical Connections
Main Power
The AGP-2000 power source must not drop below certain voltages, depending on
the model of the Ticket Dispenser.
• A 120VAC model must not drop below 90VAC with a 7 ampere load.
• A 220/240VAC model must not drop below 180VAC with a 3.5 ampere load.
The AGP-2000 is equipped with a main power Field Connect Box. You must run
conduit (rigid or flexible) from the field wiring conduit to the conduit connection
provided on the bottom of the Field Connect Box. Refer to Figure 3-2 below.
1.
Warning:
Make sure the power source to the field wiring is disconnected.
2. Turn the Logic Power switch OFF.
3. Turn OFF both Main Power Breakers as shown above.
4. Remove the four phillips-head screws securing the ticket box bracket. Set the
bracket and screws aside.
5. Loosen the screws securing the Field Connect Box cover. Set the cover and
attached screws aside.
6. Remove one of the the Conduit Knockouts on the bottom of the Field
Connect Box.
7. Run the main power and ground connections from the field wiring up through
the Conduit Knockout Hole.
8. Make sure there is no more than 6” (15.24 cm) of field wiring inside the Field
Connect Box to make connections with the internal wiring.
9. Use an NEC standard conduit connector to secure the main power conduit to
the bottom of the Field Connect Box.
10. Connect the HOT wire from the field wiring to the BROWN wire in the Field
Connect Box.
11. Connect the NEUTRAL wire from the field wiring to the WHITE wire in the Field
Connect Box.
AGP-2000 Installation and Operations / INSTALLATION
3 - 3
Figure 3-2, Main Power Field Connect Box with Cover Removed
Содержание AGP-2000 Series
Страница 1: ...AGP 2000 Series Ticket Dispenser INSTALLATION OPERATIONS MANUAL ...
Страница 2: ......
Страница 4: ......
Страница 6: ...ii AGP 2000 Installation and Operations TABLE OF CONTENTS ...
Страница 8: ...1 2 AGP 2000 Installation and Operations INTRODUCTION ...
Страница 14: ...2 6 AGP 2000 Installation and Operations SPECIFICATIONS ...
Страница 26: ...AGP 2010 Schematic 3 12 AGP 2000 Installation and Operations INSTALLATION Figure 3 13 AGP 2010 Schematic ...
Страница 38: ...4 10 AGP 2000 Installation and Operations SERVICE ...
Страница 39: ......