
56
MF-C2000A Series
3 . Connecting the Hose for Cooling Water
Preparing the Cooling Water
This section explains how to supply the cooling water .
Item required
Cooling water (10 liters) and water feed pump
CAUTION
Use our specified cooling water . Tap water, industrial water, or ground water may
cause corrosion or clogging, resulting in fault of the equipment .
⇒
When the chiller is operated for the first time after water feeding, the water level
lowers. If it is lower than the lower limit, replenish cooling water again.
⇒
Be sure to confirm that the feed-water inlet filter is installed before supply the wa
-
ter. Otherwise, the pump may fail due to contamination of foreign substances.
Remove the cap and confirm that the feed-water inlet
filter is installed before supplying water.
Feed-water inlet filter
Chiller
Содержание MF-C2000A Series
Страница 1: ...AA04OM1209213 07 FIBER LASER WELDER MF C2000A Series OPERATION MANUAL ...
Страница 21: ...Introduction Part ...
Страница 22: ......
Страница 34: ......
Страница 42: ......
Страница 43: ...Installation and Preparation Part ...
Страница 44: ......
Страница 73: ...Operating Part ...
Страница 74: ......
Страница 78: ......
Страница 142: ......
Страница 208: ...208 MF C2000A Series 4 Connector Functions REM I L Connector E STOP Connector Refer to the Operating Part Chapter 4 ...
Страница 212: ......
Страница 213: ...Maintenance Part ...
Страница 214: ......
Страница 232: ......
Страница 244: ......
Страница 245: ...Appendixes ...
Страница 246: ......