area of use and heat source 

requirements

Taking into consideration the ambient conditions, limits 
of use and the relevant regulations, every heat pump can 
be used in new or existing heating systems.

  “Technical data / scope of delivery” overview,

Water temperature / Water quantity

The water in the extraction well of the heat source 
system must have a minimum temperature of 7 °c all 
year round and may not exceed a temperature of 25°c. 
depending on the heat output required or its cooling 
capacity as a relevant variable for dimensioning the heat 
source, a minimum water rate is required, which must 
be provided by the heat source as a continuous output. 
before installing the water/water heat pump, a pump test 
should/must be carried out for at least 12 hours with 
verification of a quasi-constantly lowered water table 
(persistence) in order to provide information about 
the quantity of water available. For efficient operation 
of the well, during the initial start-up the nominal flow 
rate must be adjusted on the heat source side. Any 
components required to enable flow balancing are to 
be installed in the pipe network here. The material of 
the components used must be chosen according to the 
water quality. The necessary flow rate (heat source 
water rate) must meet the heat pump's requirements.

  “Technical data/scope of delivery” overview.

Water quality

In Germany the well must be designed and built to 
dIn 4021 and vdI 4640 (in other countries according 
to the corresponding regulations). Wells may only be 
drilled and built by drilling companies with a permit in 
accordance with dvGW W120. The water quality of the 
heat source is defined as normal groundwater. Ensure 
that the suction and return pipe always extends below 
the water level by sufficient depth, to ensure that oxygen 
is not added to the water (risk of iron oxide deposits). 
please discuss the problem of iron oxide deposits with 
your well builder. during the planning the quality of the 
groundwater should be checked in advance as well as 
possible (e.g. by asking the competent water authority 
or searching for data on existing adjacent wells) and 
subsequently verified by water analysis in the built 
production well. The following table helps to assess the 
water quality.

 

Important

 

A water analysis and pump test must be carried 
out before installing the water/water heat pump.

 note:

 

Water analyses are prepared by water test 
laboratories. Initial information about possible 
use of groundwater is available from your local 
water management authority. A pump test 
provides information as to whether a sufficient 
quantity / rate of water is available to cover the 
requirements for the heating output of your 
unit. The minimum groundwater flow rate must 
at least be available as a continuous output.

 “Technical data/scope of delivery” overview, 

“Heat source flow rate” section.

evaluation of the Water analysis

Water constituents - minimum requirement. The water 
should be analysed in advance for the test values listed 
below (table). An important criterion to be used for 
taking water samples is the dvGW standard, Technical 
notices, leaflet W 112 and use of the technical rules 
listed in it (dIn, En and Iso standards).

Designation

Limit

pH value

> 6.8

Iron level 

< 0.2 mg / l

Manganese level 

< 0.1 mg / l

Chloride level 

< 300 mg / l

Level of free chlorine 

< 3 mg / l

Turbidity

none

Technical freedom from 

sand

< 0.1 mg / l sand per

10 l pumped water

 

Important

 

If a value does not conform to the value listed in 
the table, a water/water heat pump may not be 
used. direct operation of the unit in conjunction 
with surface water, wastewater, industrial 
wastewater or mixtures of water and alkali 
solutions, acids or chlorine is also not allowed.

Содержание WWP 1100x

Страница 1: ...serve the right to modify technical specifications without prior notice 83050800aUK Translation of the operating manual Alpha InnoTec GmbH Professional Operating Manual Heat pumps Water Water UK WWP s...

Страница 2: ...s that apply to the respective type of unit This operating manual is intended only for persons assigned to work on or with the unit Treat all its constituent parts confidentially They are protected by...

Страница 3: ...rcuit 14 Water quality 14 Cleaning and flushing unit components 15 Insulating the hydraulic connections 16 Installing the control panel 16 Installation and removal of the screen 18 Buffer tank 19 Circ...

Страница 4: ...ended use The construction and design of the unit conform to current state of the art standards all relevant DIN VDE regulations and all relevant safety regulations Every person who carries out work o...

Страница 5: ...laws guidelines directives and standards concerning the recovery recycling and disposal of the operating materials and components of chillers Dismantling How heat pumps work Heat pumps operate on the...

Страница 6: ...Ensure that the suction and return pipe always extends below the water level by sufficient depth to ensure that oxygen is not added to the water risk of iron oxide deposits Please discuss the problem...

Страница 7: ...day reduces energy consumption and your heating bill Care of the unit You can clean the outer surfaces of the unit with a damp cloth and proprietary household cleaning products Do not use cleaning or...

Страница 8: ...of delivery 1 Compact unit with hermetic compressor all safety relevant components for refrigeration circuit monitoring installed heating and heat pump controller sensors installed in the unit for re...

Страница 9: ...8 kg m R 407C 0 31 kg m R 410A 0 44 kg m Technical data scope of supply overview General unit data section Minimum room volume Refrigerant capacity kg Limit kg m Note If several heat pumps of the same...

Страница 10: ...e cover plates supplied Detailed drawing of concrete foundation 1 Screed 2 approx 100 mm 3 Structural borne sound insulation depending on weight of heat pump 4 Concrete foundation 5 Perimeter insulati...

Страница 11: ...aulics must be equipped with a buffer tank the volume of which depends on your unit model The hydraulic connections are located at the rear of the unit Dimensioned drawings Important When installing t...

Страница 12: ...he unit can occur Electrical connection work The following applies to all work to be done Danger Risk of fatal electric shock Electrical connection work must be carried out by qualified electricians o...

Страница 13: ...diately Familiarise yourself with the inside of the unit 1 Electrical switchbox 2 Intermediate floor of the unit Open the unit s electrical switchbox To do this only loosen the two upper screws of the...

Страница 14: ...is used to fill the heating system no scale can form This effectively and permanently prevents limescale deposits and the resulting negative effects on the entire heating system Flushing and filling...

Страница 15: ...the safe side with low salt operation The problems listed above do not occur at all with low salt operation as the heating water contains neither corrosive salts such as sulphates chlorides and nitrat...

Страница 16: ...ting circuit and the heat source Insulate the heat source so that it is vapour diffusion tight Installing the control panel Danger Risk of fatal electric shock Electrical connection work must be carri...

Страница 17: ...ntrol panel Note A connection to a computer or a network can be made via the left socket at the bottom of the control panel thereby allowing the heating and heat pump controller to be controlled remot...

Страница 18: ...s the middle of the masking plate Then release the lugs on the opposite side Installation and removal of the screen Installing the screen Note The masking plate is provided in the as delivered unit so...

Страница 19: ...echnical data Scope of delivery overview Electrics For details of the minimum heating circuit heat source flow rate refer to the Technical data Scope of delivery overview Heating circuit heat source s...

Страница 20: ...eat pump systems In Germany Send completion report for heat pump systems and general checklist to the manufacturer s factory customer service department Outside of Germany Send completion report for h...

Страница 21: ...ing system personnel may dismantle the unit from the system Important The antifreeze mixture of the heat source must not be allowed to get into the sewers Collect antifreeze mixture and dispose of pro...

Страница 22: ...ntity kg Electrics Voltage code all pole circuit breaker heat pump A Voltage code circuit breaker control voltage A Voltage code circuit breaker electric heating element A Heat pump Effective power co...

Страница 23: ...2 5 5 5 5 8 0 813220 f WWP 900X 88 9 5 2 47 1 5 4 87 2 3 7 46 2 3 8 83 6 4 9 44 3 5 1 82 7 4 0 43 8 4 0 20 60 7 25 57 17600 17600 30600 0 26 17600 Grundfos SP17 3 2 31 17600 7600 8500 15500 0 06 8500...

Страница 24: ...35 C 2VD 50 C 2VD 35 C 1VD 50 C 1VD COP 2 3 4 5 6 7 8 5 10 15 20 25 30 Temp C Pe kW 0 5 10 15 20 5 10 15 20 25 30 Temp C p bar 0 0 0 1 0 2 0 3 0 4 0 0 2 0 4 0 6 0 8 0 10 0 p p bar 0 0 0 1 0 2 0 3 0 4...

Страница 25: ...VD 50 C 2VD 35 C 1VD 50 C 1VD COP 2 3 4 5 6 7 8 5 10 15 20 25 30 Temp C Pe kW 5 10 15 20 25 5 10 15 20 25 30 Temp C p bar 0 0 0 1 0 2 0 3 0 4 0 0 2 0 4 0 6 0 8 0 10 0 12 0 14 0 p p bar 0 0 0 1 0 2 0 3...

Страница 26: ...35 C 2VD 50 C 2VD 35 C 1VD 50 C 1VD COP 2 3 4 5 6 7 8 5 10 15 20 25 30 Temp C Pe kW 5 10 15 20 25 30 5 10 15 20 25 30 Temp C p bar 0 0 0 1 0 2 0 3 0 4 0 0 5 0 10 0 15 0 20 0 p p bar 0 0 0 1 0 2 0 3 0...

Страница 27: ...35 C 2VD 50 C 2VD 35 C 1VD 50 C 1VD COP 2 3 4 5 6 7 8 5 10 15 20 25 30 Temp C Pe kW 5 10 15 20 25 30 5 10 15 20 25 30 Temp C p bar 0 0 0 1 0 2 0 3 0 4 0 0 5 0 10 0 15 0 20 0 p p bar 0 0 0 1 0 2 0 3 0...

Страница 28: ...ensor cables 3 Heating water outlet flow Flange 2 IG DIN 2566 4 Heat source inlet Flange 2 IG DIN 2566 5 Heat source outlet Flange 2 IG DIN 2566 6 Heating water inlet return Flange 2 IG DIN 2566 7 Str...

Страница 29: ...06 12 4 2007 RA Von RA Markieton RA Erst Gep Norm A DIN Legend UK819135 c All dimensions in mm A Front view C Top view Item Designation 1 Shaded area free space for service purposes 2 Concrete foundat...

Страница 30: ...20 1 50 Det Ma stab Datum Name Erstellt Gepr Norm 4 6 2004 Aepfelbach 12 4 2007 Aepfelbach toleranz Allgemein DIN ISO 2768 c Oberfl chen ArtikelNr 819136 Aufstellung_Mindestabst nde_SWP_WWP 2 Legend...

Страница 31: ...N PE Verteilung f r externe 230V Ger te ZW2 SST 4 ZUP Leitungsschutzschalter Steuerung A1 VBO A3 L1 A2 L1 Bezeichnung HUP PE ZW2 SST F10 A1 F12 Aussenf hler Steuersignal zus tzlicher W rmeerzeuger 2...

Страница 32: ...Brunnen Solepumpe Motorschutzschalter Brunnen Solepumpe M2 Verdichter 1 Klemmleiste in Schaltkasten W rmepumpe N PE Verteilung f r externe 230V Ger te Einspeisung Leistung Verdichter Rechtsdrehfeld is...

Страница 33: ...Sch tz Verdichter 1 1 2 3 N PE Einspeisung Steuerung 1 N PE 230V 50Hz F1 DE817328 Legende EVU Durchflusschalter F6 Externer Durchflusschalter Br cke wenn kein Schalter angeschlossen wird Funktion Netz...

Страница 34: ...er R9 Zubeh r Raumfernversteller R7 Vorlauff hler Zubeh r Brauchwasser Thermostat R8 R3 RFV TVL TWE W rmequelle Eintrittsf hler F hler Mischkreis 1 TWA R11 BWT R5 Heissgasf hler THG TBW SWP 270H 430 W...

Страница 35: ...ichter 2 Anlaufstrom Begrenzung Verdichter 1 Anlaufstrom Begrenzung Verdichter 2 N2 F5 MOT MOT 1 F4 N1 berlastrelais Verdichter 1 3 PE 400V 50Hz DE817329 3 PE 400V 50Hz M3 X7 B1 Bypass Sch tz Verdicht...

Страница 36: ...z HDP 1 F1 DE817329 Sch tz Verdichter 1 Reglerplatine Achtung I max 6A 230VAC 1 2 3 N PE Einspeisung Steuerung Betriebsmittel Energie Versorger Kontakt bei Freigabe geschlossen Br cke wenn keine Sperr...

Страница 37: ...R7 Vorlauff hler Zubeh r Brauchwasser Thermostat R8 R3 RFV TVL TWE W rmequelle Eintrittsf hler F hler Mischkreis 1 TWA R11 BWT R5 Heissgasf hler THG TBW SWP 330H 500H 540 820 WWP 700X 1100X Datum 8173...

Страница 38: ...WP 1100X 100 371 EC Directives Harmonised EN 2006 42 EC EN 378 EN 349 2006 95 EC EN 60529 EN 60335 1 2 40 2004 108 EC EN ISO 12100 1 2 EN 55014 1 2 97 23 EC EN ISO 13857 EN 61000 3 2 3 3 National stan...

Страница 39: ...elt Ja schwingungsentkopplungen der Heizkreis und W rmequellenanschl sse montiert Ja solarthermie anlage nein Ja solarthermie Anlage bef llt luftfrei und dicht Ja Frostschutz gepr ft bis c Typ Frostsc...

Страница 40: ......

Страница 41: ...derte Inbetriebnahme Ibn Art nr 16002101 Ibn p5 EW Art nr 16002501 Ibn 5 Art nr 16002201 Ibn Wp lG5 Art nr 16000901 Ibn 5 EW Art nr 16002301 Ibn l Art nr 16005001 Ibn p5 Art nr 16002401 Ibn l EW Art n...

Страница 42: ...E Alpha InnoTec GmbH Industriestrasse 3 95359 Kasendorf Tel 49 0 9228 990190 Fax 49 0 9228 9906199 info alpha innotec com www alpha innotec com DK ASAP Energy Tinggaardvej 7 6400 S nderborg Tel 45 0 7...

Страница 43: ...ww hydro tech pl PT GudEnergy Energias Renov veis Lda Av O S culo 21 r c D to 2135 231 Samora Correia Tel 351 0 263 652 727 Fax 351 0 263 652 526 info gudenergy pt www gudenergy pt SE Bj rneroth Tekni...

Страница 44: ......

Отзывы: