16
We reserve the right to modify technical specifications without prior notice.
83050800aUK – Translation of the operating manual
© Alpha-InnoTec GmbH
insulating the hydraulic
connections
note.
Insulate the heating circuit and the heat source
according to relevant local standards and
guidelines.
check all hydraulic connections for leaks. perform
pressure test…
Insulate all connections, vibration isolators,
connections and pipes of the heating circuit and the
heat source. Insulate the heat source so that it is
vapour-diffusion tight
.
installing the control panel
Danger!
risk of fatal electric shock!
electrical connection work must be
carried out by qualified electricians only.
Before opening the unit, safely disconnect
the system from the power supply and
prevent it from being switched back on!
There are 4 each recesses at different heights in the
front panel of the unit for fastening the control panel:
1 four upper recesses
2 four lower recesses
There are 4 hooks at the rear of the control panel,
which are used to hook the control panel on the front
panel of the unit: