10
We reserve the right to modify technical specifications without prior notice.
83050800aUK – Translation of the operating manual
© Alpha-InnoTec GmbH
note.
Always refer to and follow the installation plan
for the respective model. note the size and
minimum clearances.
Installation plan for the respective model.
Important
The heat pump must be installed on a firm,
horizontal floor. Ensure that the floor is designed
for the weight of the heat pump.
do not use a rigid foam boiler pedestal
“Technical data/scope of delivery” overview,
“General unit data” section.
note.
Install the unit so that the operator side is
accessible at all times!
Important
do not tilt the unit more than a maximum of 45°
in any direction.
note.
The openings for the pallet truck must be closed
off using the cover plates supplied!
detailed drawing of concrete foundation:
1 screed
2 approx. 100 mm
3 structural borne sound insulation
depending on weight of heat pump
4 concrete foundation
5 perimeter insulation strips
6 Impact sound insulation
7 concrete ceiling
Important
do not tilt the unit more than a maximum of 45°
in any direction.
To prevent transport damage, you should transport the
unit to its final place of installation in its packed condition
(on the wooden pallet with packaging) using a pallet
truck.
Remove packaging and set extra box aside (will be
needed later on!)...
move the pallet truck under the unit…
note.
The two openings for the pallet truck must be
closed off using the cover plates supplied (two
screws each).
note.
please always close off the transport openings to
reduce noise!
installation
CautIon!
several people are required to install the
unit.
note.
Take into account the size of the unit.
“Technical data / scope of delivery” overview,
“General unit data” section.