Current transformer clipping 

Clipping the current transformers onto the service  

side cable:
1. Match the labelled CTs with their corresponding 

labelled service supply cable.

2.  Confirm correct polarity of the CT by ensuring  

the arrow on the CT head matches the current  

flow direction on the service supply cable.

3. Clip CT over service supply cable.

Important:

Make sure that each CT is clipped 

to the corresponding unit.

Important:

The CT must be connected on the service 

side of the point of connection of solar  

supply, as per diagram.

POLARITY   

OF CURRENT 

TRANSFORMERS 

DOWN TOWARDS  

LOAD

R1

R1

FROM   

SOLAR

SERVICE SIDE

LOAD SIDE

*

* The point of connection of the solar may appear 

different in your case depending on the Project SLD.  

In any case, the CT must be on the line side of the point 

of connection of the solar supply.

C. Labeling

The SolShare comes with a Label Pack for you to use 

where appropriate. Other labelling will also be required 

based on your installation and local requirements. For 

more information, refer to the SolShare Labelling Advice 

document. Please refer below for information about 

SolShare-specific labelling. 
Leave a copy of the Project SLD at site to provide guidance 

to any other electrician working on the switchboard.

X X X X X X

M1

X X X X X X

M2

X X X X X X

M3

X X X X X X

M4

6

5

4

3

2

1

7 8 9 10 11 12 13 14 15

X X X X X X

M5

X X X X X X

M6

X X X X X X

M7

X X X X X X

M8

X X X X X X

M9

X X X X X X

M10

X X X X X X

M11

X X X X X X

M12

X X X X X X

M13

X X X X X X

M14

X X X X X X

M15

WARNING

S

olar wired on the line/service side

 

of Tenancy Main Switches

F

ollow Solar Shutdown Procedure, 

located on inverter(s), before 

working on meter panel

Warning

Shared Solar System

To isolate a single unit:
1. Turn off their MAIN SWITCH INVERTER SUPPLY

2. Turn off their MAIN SWITCH NORMAL SUPPLY

X X X X X X

M1

X X X X X X

M2

X X X X X X

M3

X X X X X X

M4

6

5

4

3

2

1

7 8 9 10 11 12 13 14 15

X X X X X X

M5

X X X X X X

M6

X X X X X X

M7

X X X X X X

M8

X X X X X X

M9

X X X X X X

M10

X X X X X X

M11

X X X X X X

M12

X X X X X X

M13

X X X X X X

M14

X X X X X X

M15

WARNING

S

olar wired on the line/service side

 

of Tenancy Main Switches

F

ollow Solar Shutdown Procedure, 

located on inverter(s), before 

working on meter panel

Warning

Shared Solar System

To isolate a single unit:
1. Turn off their MAIN SWITCH INVERTER SUPPLY

2. Turn off their MAIN SWITCH NORMAL SUPPLY

Area of focus:  

Labeling

Line side wiring

WARNING

Solar wired on the line/service side 

of Tenancy Main Switches
Follow Solar Shutdown Procedure, 

located on inverter(s), before 

working on meter panel

NOTE: This must be visible from all meters (contact  

Allume if additional labels are required). Do not apply this 

label if SolShare connections have been made on the load 

side of the Main Switch (Normal Supply). Instead, use a 

standard multiple supplies warning label)).

Warning tenancy shutdown

Warning

Shared Solar System

To isolate a single unit:
1. Turn off their MAIN SWITCH INVERTER SUPPLY

2. Turn off their MAIN SWITCH NORMAL SUPPLY

NOTE: This must be visible from all Tenancy Main  

Switches (contact Allume if additional labels are required). 

Add these additional labels as suitable:
- SolShare Maintenance Isolator (Inverter) label

- SolShare Maintenance Isolator (Grid) labels

- Tenancy Main Switch (Inverter Supply) labels

-  Tenancy Main Swtich (Normal Supply) labels  

(not provided with SolShare)

South Australia only: 
- Multiple supplies label next to each meter

- SolShare Inverter Supplies tags

Содержание SolShare SOLSHARE-3P-35A-03

Страница 1: ...1 SolShare Installation Manual...

Страница 2: ...2...

Страница 3: ...eling section Updated Commissioning section V4 1 18 08 2021 Updated links Updated Commissioning Document V5 0 23 08 2021 Updated to reflect product changes associated with the removal of 4G dongle and...

Страница 4: ...Installation site selection B Installation III Electrical connection A Input output connections B Running current transformer tails C Labeling IV Commissioning A Preparing the SolShare for commissioni...

Страница 5: ...upport allumeenergy com au with any queries List of supplementary documents available online For most up to date versions of all documents including this Installation Manual scan this QR code or go to...

Страница 6: ...er name Company Electrician license number Allume SIP training certification number SolShare Connection Unit Connected eg Apt 1 Unit B Common light power No connection Single Phase Three Phase R1 W1 B...

Страница 7: ...appears at grounding points within the SolShare equipment This symbol is also used in the manual Handling and Safety Instructions SAFETY SYMBOLS INFORMATION The following safety symbols are used in th...

Страница 8: ...uipment Any violation could result in personal death or injury or damage to the device Installation is only to be conducted by a certified electrician This guide is provided to help the installer unde...

Страница 9: ...itch Inverter Supply is required on each output ideally located within the unit main switchboard between the SolShare and each unit s main switch In series with this additional SolShare Maintenance Is...

Страница 10: ...able commissioning and ongoing monitoring Do not mount the SolShare on flammable wall material 90 Mounted Vertically Do not mount the SolShare near flammable material or gases 90 Mounted Vertically En...

Страница 11: ...ecure the mounting brackets to the chosen wall for installation Allume Energy recommend using the provided fasteners to attach the brackets into a suitable stone or masonry wall If another wall materi...

Страница 12: ...inals Retain screws to replace later Important The cover should lock into place when it s pulled up properly Before beginning wiring ensure cover is locked in place by pulling down firmly To bring cov...

Страница 13: ...ram above Warning The SolShare may divert all solar energy to any one unit in a point in time As a result all input output cables should be sized for maximum solar energy output The AC cables Please c...

Страница 14: ...d have been designed in accordance to the SolShare System and SLD Design Guidelines If no project SLD exists please contact project owner or system design engineer For ease of isolation of the SolShar...

Страница 15: ...output power cables to appropriate length to reach from SolShare Maintenance Isolators Grid Label both ends of these cables with the tenancy number 3 If using SolShare Maintenance Isolators Grid Run c...

Страница 16: ...se 3 Repeat steps 1 2 for white and blue phase connector blocks 4 Plug each CT connector block into the corresponding socket of the SolShare Important Make sure colours and orientation of connectors a...

Страница 17: ...on inverter s before working on meter panel Warning Shared Solar System To isolate a single unit 1 Turn off their MAIN SWITCH INVERTER SUPPLY 2 Turn off their MAIN SWITCH NORMAL SUPPLY X X X X X X M1...

Страница 18: ...nter the SSID and password of the Wifi network that you want the SolShare to connect to 4 Once you see a confirmation page in the browser wait for the SolShare to reboot 5 Disconnect your device from...

Страница 19: ...19...

Страница 20: ...tallations in Australia Specifications are subject to changes without advanced notification For the most up to date documentation vist www allumeenergy com Allume Energy Ltd www allumeenergy com info...

Отзывы: