Important

It is recommended to label both ends of each cable with the appropriate tenancy name (e.g. Unit 21) and 

SolShare output name (e.g. R1 or W4, etc.) to ensure the correct cable is wired into the correct tenancy in 

the main switchboard.

Important

For maintenance and troubleshooting purposes, it is requested to write the tenancy names corresponding 

to each output on the bottom plate of the SolShare (with permanent marker).

Important

SolShare must have output connection (with grid connection) to R1, W1, B1 for correct operation. 

If possible, wire these to common power connection.

Important

Check the order of the SolShare outputs carefully. The SolShare terminal block is configured to wire in 

the order R1, W1, B1, R2, W2, B2, R3, ... etc. Ensure the connections from the Tenancy Main Switches 

(Inverter Supply) via any SolShare Maintenance Isolators (Grid) are connected in this order. Ensure the 

switches are labeled clearly and logically.

Follow these steps to complete the output wiring:

1. Complete the Unit Connected column of the Commissioning Document on page 6, allocating a SolShare output 

to a unit/apmt number. 

2.  If using SolShare Maintenance Isolators (Grid): Cut output power cables to appropriate length to reach from 

SolShare Maintenance Isolators (Grid). Label both ends of these cables with the tenancy number.

3.  If using SolShare Maintenance Isolators (Grid): Run cables between SolShare and SolShare Maintenance 

Isolators (Grid). Terminate cables to appropriate SolShare output connectors as per the configuration in step 1.

4. Cut the power cables to appropriate length to run from the SolShare Maintenance Isolators (Grid) to the Tenancy 

Main Switches (Inverter Supply) in the Main Switchboard. Run and terminate these cables.

Warning

Only one neutral and ground shall be wired out of the SolShare, as shown in the diagram on page 14. 

Output neutral and ground must be wired to main neutral bar and main earth bar respectively, located in 

the main switchboard.

Warning
- Ensure the phase of the solar supply correctly matches the phase of the unit’s supply from the grid.
- Additional circuit breakers must be sized to perform overload protection for SolShare output cables.
- The solar system max output must be less than the main circuit breaker rating of every connected unit.
-  The neutral for the SolShare must be wired directly to the main neutral bar inside the main switchboard,  

i.e. at the MEN link.

Point of connection of solar should be on the service side of tenancy main switch unless specified 

otherwise by your Project SLD.

Содержание SolShare SOLSHARE-3P-35A-03

Страница 1: ...1 SolShare Installation Manual...

Страница 2: ...2...

Страница 3: ...eling section Updated Commissioning section V4 1 18 08 2021 Updated links Updated Commissioning Document V5 0 23 08 2021 Updated to reflect product changes associated with the removal of 4G dongle and...

Страница 4: ...Installation site selection B Installation III Electrical connection A Input output connections B Running current transformer tails C Labeling IV Commissioning A Preparing the SolShare for commissioni...

Страница 5: ...upport allumeenergy com au with any queries List of supplementary documents available online For most up to date versions of all documents including this Installation Manual scan this QR code or go to...

Страница 6: ...er name Company Electrician license number Allume SIP training certification number SolShare Connection Unit Connected eg Apt 1 Unit B Common light power No connection Single Phase Three Phase R1 W1 B...

Страница 7: ...appears at grounding points within the SolShare equipment This symbol is also used in the manual Handling and Safety Instructions SAFETY SYMBOLS INFORMATION The following safety symbols are used in th...

Страница 8: ...uipment Any violation could result in personal death or injury or damage to the device Installation is only to be conducted by a certified electrician This guide is provided to help the installer unde...

Страница 9: ...itch Inverter Supply is required on each output ideally located within the unit main switchboard between the SolShare and each unit s main switch In series with this additional SolShare Maintenance Is...

Страница 10: ...able commissioning and ongoing monitoring Do not mount the SolShare on flammable wall material 90 Mounted Vertically Do not mount the SolShare near flammable material or gases 90 Mounted Vertically En...

Страница 11: ...ecure the mounting brackets to the chosen wall for installation Allume Energy recommend using the provided fasteners to attach the brackets into a suitable stone or masonry wall If another wall materi...

Страница 12: ...inals Retain screws to replace later Important The cover should lock into place when it s pulled up properly Before beginning wiring ensure cover is locked in place by pulling down firmly To bring cov...

Страница 13: ...ram above Warning The SolShare may divert all solar energy to any one unit in a point in time As a result all input output cables should be sized for maximum solar energy output The AC cables Please c...

Страница 14: ...d have been designed in accordance to the SolShare System and SLD Design Guidelines If no project SLD exists please contact project owner or system design engineer For ease of isolation of the SolShar...

Страница 15: ...output power cables to appropriate length to reach from SolShare Maintenance Isolators Grid Label both ends of these cables with the tenancy number 3 If using SolShare Maintenance Isolators Grid Run c...

Страница 16: ...se 3 Repeat steps 1 2 for white and blue phase connector blocks 4 Plug each CT connector block into the corresponding socket of the SolShare Important Make sure colours and orientation of connectors a...

Страница 17: ...on inverter s before working on meter panel Warning Shared Solar System To isolate a single unit 1 Turn off their MAIN SWITCH INVERTER SUPPLY 2 Turn off their MAIN SWITCH NORMAL SUPPLY X X X X X X M1...

Страница 18: ...nter the SSID and password of the Wifi network that you want the SolShare to connect to 4 Once you see a confirmation page in the browser wait for the SolShare to reboot 5 Disconnect your device from...

Страница 19: ...19...

Страница 20: ...tallations in Australia Specifications are subject to changes without advanced notification For the most up to date documentation vist www allumeenergy com Allume Energy Ltd www allumeenergy com info...

Отзывы: