background image

3

Australia - AE-PN-101-V5.0

This manual is intended for installations in Australia of SolShare model  

SOLSHARE-3P-35A-03.

It is subject to change. Please check our website at  

https://allumeenergy.com/document-library for the most up-to-date manual version.

Version 

Date released 

Updates

V3.0

23/03/2021

V4.0

27/07/2021

 

– Addition of linked documents for additional information

 

– Updated Installation Overview section

 

– Updated switch and isolator names to align with Australian Standards

 

– Updated Installation Site Selection section

 

– Updated Electrical connection section

 

– Updated advice about current transformers

 

– Added Labeling section

 

– Updated Commissioning section

V4.1

18/08/2021

 

– Updated links

 

– Updated Commissioning Document

V5.0

23/08/2021

 

– Updated to reflect product changes associated with the removal of 

4G dongle and addition of Wi-Fi access point.

 

– Addition of CT connection aid

AE-PN-101-V5.0
© Copyright – Allume Energy - All rights reserved.
This manual accompanies our equipment for use by the end users.
The technical instructions and illustrations contained in this manual are to be treated as confidential and no part may be reproduced without the prior 

written permission of Allume Energy and end users may not divulge the information contained herein or use this manual for purposes other than those 

strictly connected with correct use of the equipment.
All information and specifications are subject to change without notice.

Содержание SolShare SOLSHARE-3P-35A-03

Страница 1: ...1 SolShare Installation Manual...

Страница 2: ...2...

Страница 3: ...eling section Updated Commissioning section V4 1 18 08 2021 Updated links Updated Commissioning Document V5 0 23 08 2021 Updated to reflect product changes associated with the removal of 4G dongle and...

Страница 4: ...Installation site selection B Installation III Electrical connection A Input output connections B Running current transformer tails C Labeling IV Commissioning A Preparing the SolShare for commissioni...

Страница 5: ...upport allumeenergy com au with any queries List of supplementary documents available online For most up to date versions of all documents including this Installation Manual scan this QR code or go to...

Страница 6: ...er name Company Electrician license number Allume SIP training certification number SolShare Connection Unit Connected eg Apt 1 Unit B Common light power No connection Single Phase Three Phase R1 W1 B...

Страница 7: ...appears at grounding points within the SolShare equipment This symbol is also used in the manual Handling and Safety Instructions SAFETY SYMBOLS INFORMATION The following safety symbols are used in th...

Страница 8: ...uipment Any violation could result in personal death or injury or damage to the device Installation is only to be conducted by a certified electrician This guide is provided to help the installer unde...

Страница 9: ...itch Inverter Supply is required on each output ideally located within the unit main switchboard between the SolShare and each unit s main switch In series with this additional SolShare Maintenance Is...

Страница 10: ...able commissioning and ongoing monitoring Do not mount the SolShare on flammable wall material 90 Mounted Vertically Do not mount the SolShare near flammable material or gases 90 Mounted Vertically En...

Страница 11: ...ecure the mounting brackets to the chosen wall for installation Allume Energy recommend using the provided fasteners to attach the brackets into a suitable stone or masonry wall If another wall materi...

Страница 12: ...inals Retain screws to replace later Important The cover should lock into place when it s pulled up properly Before beginning wiring ensure cover is locked in place by pulling down firmly To bring cov...

Страница 13: ...ram above Warning The SolShare may divert all solar energy to any one unit in a point in time As a result all input output cables should be sized for maximum solar energy output The AC cables Please c...

Страница 14: ...d have been designed in accordance to the SolShare System and SLD Design Guidelines If no project SLD exists please contact project owner or system design engineer For ease of isolation of the SolShar...

Страница 15: ...output power cables to appropriate length to reach from SolShare Maintenance Isolators Grid Label both ends of these cables with the tenancy number 3 If using SolShare Maintenance Isolators Grid Run c...

Страница 16: ...se 3 Repeat steps 1 2 for white and blue phase connector blocks 4 Plug each CT connector block into the corresponding socket of the SolShare Important Make sure colours and orientation of connectors a...

Страница 17: ...on inverter s before working on meter panel Warning Shared Solar System To isolate a single unit 1 Turn off their MAIN SWITCH INVERTER SUPPLY 2 Turn off their MAIN SWITCH NORMAL SUPPLY X X X X X X M1...

Страница 18: ...nter the SSID and password of the Wifi network that you want the SolShare to connect to 4 Once you see a confirmation page in the browser wait for the SolShare to reboot 5 Disconnect your device from...

Страница 19: ...19...

Страница 20: ...tallations in Australia Specifications are subject to changes without advanced notification For the most up to date documentation vist www allumeenergy com Allume Energy Ltd www allumeenergy com info...

Отзывы: