x510 Series Installation Guide for Stand-alone Switches
97
Cabling Switches with AT-StackOP/0.3 or AT-StackOP/9.0
Transceivers
For guidelines to cabling the switches with AT-StackOP/0.3 or AT-
StackOP/9.0 fiber optic transceivers, refer to “Planning a Stack” on
page 67. To cable switches with fiber optic transceivers, perform the
following procedure:
1. Remove a dust cover from either the S1 or S2 slot on the switch.
2. To install the transceiver in the S1 slot, position it with the handle on
top, as shown in Figure 54. To install it in the S2 slot, position it with
the handle on the bottom.
Figure 54. Handle on the AT-StackOP/0.3 and AT-StackOP/9.0
Transceivers
3. Slide the transceiver into the slot until it clicks into place, as shown in
Figure 55 on page 98.
Handle
Содержание AT-x510-28GPX
Страница 10: ...Tables 10 ...
Страница 14: ...Preface 14 ...
Страница 48: ...Chapter 1 Overview 48 ...
Страница 70: ...Chapter 3 Beginning the Installation 70 ...
Страница 84: ...Chapter 4 Installing the Switches on a Table or in an Equipment Rack 84 ...
Страница 128: ...Chapter 9 Troubleshooting 128 ...
Страница 138: ...Appendix A Technical Specifications 138 ...