Chapter 4: Installing the Switches on a Table or in an Equipment Rack
78
Figure 30. Attaching the Stranded Grounding Wire to the Ring Lug
3. Use a 7mm wrench to remove the top nut from the grounding post on
the power supply. Refer to Figure 31.
Figure 31. Removing the Nut from the Grounding Post
Note
Remove only the top nut from the grounding post. If necessary, use
a second 7mm wrench to hold the bottom nut still while removing the
top nut.
4. Attach the grounding lug and wire to the grounding post and secure
them with the nut removed in Step 3 and a 7mm wrench. Allied Telesis
recommends tightening the nut to 15 in-lbs. Refer to Figure 32 on
page 79.
Содержание AT-x510-28GPX
Страница 10: ...Tables 10 ...
Страница 14: ...Preface 14 ...
Страница 48: ...Chapter 1 Overview 48 ...
Страница 70: ...Chapter 3 Beginning the Installation 70 ...
Страница 84: ...Chapter 4 Installing the Switches on a Table or in an Equipment Rack 84 ...
Страница 128: ...Chapter 9 Troubleshooting 128 ...
Страница 138: ...Appendix A Technical Specifications 138 ...