x510 Series Installation Guide for Virtual Chassis Stacks
75
Figure 26. Attaching the Equipment Rack Brackets (Continued)
5. While another person holds the switch in the equipment rack, secure it
using standard equipment rack screws (not provided), as shown in
Figure 27.
Figure 27. Mounting the Switch in an Equipment Rack
6. Repeat this procedure to install the remaining switches in the stack.
7. After installing the switches, go to Chapter 5, “Verifying the Status of
VCStack” on page 85 to verify that VCStack is enabled on the units.
Содержание AT-x510-28GPX
Страница 10: ...Tables 10 ...
Страница 14: ...Preface 14 ...
Страница 48: ...Chapter 1 Overview 48 ...
Страница 70: ...Chapter 3 Beginning the Installation 70 ...
Страница 84: ...Chapter 4 Installing the Switches on a Table or in an Equipment Rack 84 ...
Страница 128: ...Chapter 9 Troubleshooting 128 ...
Страница 138: ...Appendix A Technical Specifications 138 ...