x510 Series Installation Guide for Stand-alone Switches
99
Figure 56. Removing the Dust Cover from a Stacking Transceiver
5. Verify the position of the handle on the transceiver. If the transceiver is
in the S1 slot, the handle should be in the upright position, as shown in
Figure 57. If the transceiver is in the S2 slot, the handle should be in
the down position.
Figure 57. Positioning the Handle in the Upright Position
6. Connect the fiber optic cable to the transceiver, as shown in Figure 58
on page 100. The connector on the cable should fit snugly into the
port, and the tab should lock the connector into place.
SFP Handle
Содержание AT-x510-28GPX
Страница 10: ...Tables 10 ...
Страница 14: ...Preface 14 ...
Страница 48: ...Chapter 1 Overview 48 ...
Страница 70: ...Chapter 3 Beginning the Installation 70 ...
Страница 84: ...Chapter 4 Installing the Switches on a Table or in an Equipment Rack 84 ...
Страница 128: ...Chapter 9 Troubleshooting 128 ...
Страница 138: ...Appendix A Technical Specifications 138 ...