Calibration
49
16.7.1 1V to 2V Load (
I1
)
Shift+Serv|Password|Calibration|Test
I
Channel | 1 - 2V Load
1)
From the Calibration menu, select Test I Channel, then 1 - 2V Load.
2)
On the CRT, press F1 Start.
3)
Adjust the Cal source so the DVM across the shunt indicates
44 to 46mV, which equals 44 to 46A through the shunt.
4)
On the CRT, press F1 Start to start the test.
5)
Press the Up/Down arrows on the CRT until the test current displayed
on the CRT matches the mV reading on the DVM.
6)
Record the actual input and the CRT reading on the Calibration form.
7)
Press F2 Accept.
16.7.2 4V to 6V Load (
I2
)
Shift+Serv|Password|Calibration|Test
I
Channel | 4 - 6V Load
1)
From the Calibration menu, select Test I Channel, then 4 - 6V Load.
2)
Press F1 Start.
3)
Adjust the Cal source to 26 to 27mV on the DVM.
4)
Press F1 Start.
5)
Press the Up/Down arrows until the test current on the CRT matches the
DVM.
6)
Record the actual input and the CRT reading on the form.
7)
Press F2 Accept.
Содержание Cellcorder CRT-300
Страница 2: ......
Страница 4: ......
Страница 8: ...iv...
Страница 70: ......
Страница 84: ...PDA Mobile Software User s Guide 70...
Страница 105: ...Application Note CC 002 A 91 Figure 4 Connections for Triple Posts Figure 5 Connections for Triple Posts...
Страница 108: ......