Operation
4-12
Pressure Sensitve Process (Reverse)
Sometimes mounting processes are required to be run between encapsulation processes. Since the nip
rolls will be very warm due to the encapsulation process it is not possible to run a cold mounting process
without letting the roll cool down. This could be a very long wait depending on the temperatures used for
the encapsulation process. It is possible to run a single side mounting process through the pull rolls in
reverse. The web diagram for this process is shown below:
Figure 9. Pressure Sensitive Process (Reverse)
Web Diagram
Содержание Encore Maxim
Страница 23: ...Operation 4 17...
Страница 28: ......
Страница 30: ......
Страница 33: ......
Страница 36: ......
Страница 39: ......
Страница 42: ......
Страница 45: ......
Страница 47: ......
Страница 49: ......
Страница 52: ......
Страница 55: ......
Страница 57: ......
Страница 59: ......
Страница 60: ......
Страница 65: ......
Страница 67: ......
Страница 69: ......
Страница 72: ......