![Agilent Technologies G1888 Скачать руководство пользователя страница 133](http://html1.mh-extra.com/html/agilent-technologies/g1888/g1888_user-information_2867733133.webp)
Maintaining the Instrument
User Information
133
3
Disconnect the plumbing from the
sampling probe.
a
Support the zero dead volume union
with a 7-mm wrench and remove the
nut with another 7-mm wrench.
b
Loosen the connection to port 5 on the
6-port valve. Lift the tube off of the
sample probe and swivel out of the
way.
c
Loosen and remove the zero dead
volume union. See the figure below.
Do not bend any tubing when
installing or the coating will break and
compromise inertness.
4
Remove the sampling probe.
•
Grab the sampling probe with
tweezers and remove it from the unit.
5
Insert a new sampling probe and
reverse the previous steps to
reassemble the Headspace
Sampler.
•
Tighten each fitting and perform a
leak test before replacing the
insulation and cover.
Table 11
Changing the sampling probe (continued)
Step
Action
Notes
Zero dead volume union
Hexagonal nut
Sampling probe
medium_standard.book Page 133 Tuesday, February 17, 2004 10:14 AM
Содержание G1888
Страница 12: ...12 User Information medium_standard book Page 12 Tuesday February 17 2004 10 14 AM...
Страница 24: ...24 User Information Introduction medium_standard book Page 24 Tuesday February 17 2004 10 14 AM...
Страница 118: ...118 User Information Developing Methods medium_standard book Page 118 Tuesday February 17 2004 10 14 AM...
Страница 162: ...162 User Information Maintaining the Instrument medium_standard book Page 162 Tuesday February 17 2004 10 14 AM...
Страница 190: ...190 User Information Index medium_standard book Page 190 Tuesday February 17 2004 10 14 AM...
Страница 191: ...medium_standard book Page 191 Tuesday February 17 2004 10 14 AM...