CHAPTER 3
OPERATION
PR1: 10/18//12 AERCO International Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
•
Ph: 800-526-0288
Page 31 of 166
GF-120
OMM-0041 0E
Benchmark 1.5LN Low NOx Boiler
Installation, Operation and Maintenance Manual
CHAPTER 3. CONTROL PANEL OPERATION
3.1 INTRODUCTION
The information in this Chapter provides a guide to the operation of the Benchmark 1.5 Boiler
using the Control Panel mounted on the front of the unit. It is imperative that the initial startup of
this unit be performed by factory trained personnel. Operation prior to initial startup by factory
trained personnel will void the equipment warranty. In addition, the following WARNINGS and
CAUTIONS must be observed at all times.
NOTE
All of the installation procedures in Chapter 2 must be completed
before attempting to start the unit.
ELECTRICAL VOLTAGES IN THIS SYSTEM MAY INCLUDE 460,
208 AND 24 VOLTS AC. IT MUST BE SERVICED ONLY BY
FACTORY CERTIFIED SERVICE TECHNICIANS
WARNING
DO NOT ATTEMPT TO DRY FIRE THE BOILER. STARTING
THE UNIT WITHOUT A FULL WATER LEVEL CAN SERIOUSLY
DAMAGE THE UNIT AND MAY RESULT IN INJURY TO
PERSONNEL OR PROPERTY DAMAGE. THIS SITUATION WILL
VOID ANY WARRANTY.
3.2 CONTROL PANEL DESCRIPTION
The Benchmark 1.5 Control Panel shown in Figure 3-1 contains all of the controls, indicators
and displays necessary to operate, adjust and troubleshoot the Benchmark 1.5 Boiler. These
operating controls, indicators and displays are listed and described in Table 3-1. Additional
information on these items are provided in the individual operating procedures provided in this
Chapter.