CHAPTER 2
INSTALLATION
PR1: 10/18//12 AERCO International Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
•
Ph: 800-526-0288
Page 29 of 166
GF-120
OMM-0041 0E
Benchmark 1.5LN Low NOx Boiler
Installation, Operation and Maintenance Manual
the outside surface. Maximize the surface area of the filter covering the 8" diameter opening by
creating a dome out of the filter material.
Cover the flared duct opening with the blue side facing outward. During construction check the
filter for dust accumulation and replace it when the accumulation becomes noticeable.
2.13 BENCHMARK PUMP RELAY OPTION
An optional Benchmark pump relay allows the user to turn a pump on/off and open/close a
motorized valve as the boiler cycles on and off on demand. The Pump Delay Timer feature
allows the user to keep the pump running and keep the motorized valve open for up to 30
minutes after the boiler has shut down and the demand is satisfied.
The Benchmark pump relay (SPDT) contact is rated for:
•
10 A Resistive @ 277 VAC/28 VDC
•
1/3 HP N/O @ 120/240 VAC
•
1/6 HP N/C @ 120/240 VAC
•
480 VA Pilot Duty @ 240-277 VAC
If pump/valve load exceeds the above contact ratings, use a separate contact relay.
See Diagrams 2-11a and 2-11b.
To identify if the boiler is equipped with the BMK Pump Relay Option (part no. 69102), look for
the label and relay in the Power Box as shown in Figure 2-12.
Figure 2-11a: Schematic – System Pump Start using Boiler Pump Relay