7
Anoxomat
Mark II CTS
User’s guide
Installation and setup
Chapter 1
1.1 Find a location for the instrument
When choosing a location for your Anoxomat, be sure to
meet the following criteria.
Adequate space
•
The dimensions of the instrument are 12.6 × 21.7 × 10.8
inches (32 × 55 × 28 cm). Be sure to keep your
workplace free of debris and allow 6 inches (15 cm) of
clear space on each side of the instrument.
Electric outlet availability
Your instrument will need to operate within five feet
of a properly grounded, three-prong electrical outlet
capable of continuously supplying 2 amperes at 220V and
5 amperes at 110V. If the instrument is not grounded
properly, its operation may be impaired and a safety
hazard may exist. Therefore, be sure to test the outlet and
record the results before operating your instrument.
1.2 Obtain additional items
To install the Anoxomat, you will need to obtain the
following items:
•
Adjustable wrench to tighten the dual stage regulator.
•
Adjustable-joint pliers to tighten the gas tube clamps.
•
Gas cylinder containing appropriate anaerobic mixture
•
Dual stage regulator (1.8 bar).
Refer to Section 1.4.
1.1 Unpack the instrument
In order to set up your instrument properly, it is important that you read and follow the steps in this section.
Please follow these steps carefully and be sure to read Chapter 2—Instrument Operation before attempting to run
your instrument.
Quantity Description
1
The Anoxomat Mark II CTS
1
Parts package
•
Gas tube(s)
•
Jar tube plug
•
Seven gas tube clamps
•
Soft-touch pen
•
Penholder
1
USB stick containing
•
Quick Installation Guide
•
Quick Usage Guide
•
User’s Guide
•
Data Interface spreadsheet template
1
Warranty Card
1
Customer Satisfaction Card
1
AC Line Cord
Table 1.1: Anoxomat Mark II CTS Packing List