Installation and Commissioning Guide - Package Ducted Variable Capacity Commercial
Doc. Part No. 0525-076 Ver. 3 210414
Installation and Commissioning Guide
Variable Capacity Commercial
16
Step 2. Remove Shipping Blocks.
Loosen the set bolts that hold the compressor down onto the unit (3 pcs)
PKV160T / PKV180T
PKV160T-180T
New Drawing
Loosen Bolts
(3-pcs / Comp.)
Shipping Blocks
PKV210T / PKV240T
PKV210T-240T
New Drawing
Shipping Blocks
Loosen Bolts
(3-pcs / Comp.)
Slide out shipping blocks as shown below.
PKV160T / PKV180T
GENTLY Push back the Compressor
PKV160T-180T
New Drawing
Pull away the Shipping
Block A first then Block B
B
A
PKV210T / PKV240T
GENTLY Push back the Compressor
PKV210T-240T
New Drawing
Pull away the Shipping
Block A first then Block B
B
A
Содержание PKV160T
Страница 57: ...THIS PAGE WAS INTENTIONALLY LEFT BLANK ...
Страница 58: ...THIS PAGE WAS INTENTIONALLY LEFT BLANK ...
Страница 59: ...THIS PAGE WAS INTENTIONALLY LEFT BLANK ...