
Gen II
User Manual
12-24 – Honeywell Performance
Chapter 12
Revision 2.20,
20
Revision History:
3/10/2015
1.01: Replaced JEDA Equipment Setup figure, added revision history table and repaired
broken Chapter reference link in footer.
Lucas
1/15/2016
2.00: Major rewrite generalizing the manual to cover both the Viper II and Cobra II. This
chapter only applies to the Viper II and the generalization has minimal impact. A note was
added prior to para. 12.1.2 with the sequence for connecting the cables and powering on the
equipment. This chapter was also updated with corrections to minor typographical errors.
East
2/27/2017
2.01: Added Lear 40 and Lear 70 to engines using the 10-320-0273 cable.
Lucas
10/18/2018
2.10: Added EMS Equipment Setup drawing to reflect EMS Direct Connect. Updated to
reflect changes relative to introduction of EMS Direct Connect.
Justice
4/01/2020
2.20: Updated screenshots to reflect SP7 UI changes.
Shively
Содержание Viper II
Страница 91: ...Chapter 5 RESERVED Revision 1 00 Dec 2014...
Страница 92: ...Chapter 6 RESERVED Revision 1 00 Dec 2014...