63
Demand
Inline
1
20100
System active power demand,
System reactive power demand,
System apparent power demand
(Acurev2010 only has active
power demand)
2
20200
Phase A, B, C active power
demand
3
20300
Phase A Real Power Demand
prediction, Phase A Real Power
Demand Peak and happening
time
4
20400
Phase B Real Power Demand
prediction, Phase B Real Power
Demand Peak and happening
time
5
20500
Phase C Real Power Demand
prediction, Phase C Real Power
Demand Peak and happening
time
6
20600
Phase A,B,C Reactive power
demand
*
7
20700
Phase A Reactive Power Demand
prediction, Phase A Reactive
Power Demand Peak and
happening time
*
8
20800
Phase B Reactive Power Demand
prediction, Phase B Reactive
Power Demand Peak and
happening time
*
9
20900
Phase C Reactive Power Demand
prediction, Phase C Reactive
Power Demand Peak and
happening time
*
Содержание AcuRev 2000
Страница 1: ...User s Manual AcuRev 2000 Smart Metering System...
Страница 2: ......
Страница 8: ...VI...
Страница 9: ...1 1 1 Meter Overview 1 2 Areas of Application 1 3 AcuRev 2000 features Chapter 1 Introduction...
Страница 15: ...7 Chapter 2 Installation 2 1 Appearance and Dimensions 2 2 Installation Methods 2 3 Wiring...
Страница 40: ...32...
Страница 93: ...85 Figure 4 7 Demand...
Страница 101: ...93 4 6 Over Under Limit Alarming Figure 4 13 Alarming in software...
Страница 104: ...96 Figure 4 15 System Event Log 4 7 System Event Log...
Страница 120: ...112 4 10 Device Information Figure 4 18 Device Information...
Страница 152: ...144 Figure 5 18...
Страница 158: ...150 Figure 5 23...
Страница 165: ...157 Request binding 1 phaseVoltageA 0 null null Response binding 1 phaseVoltageA 0 integer 0 Figure 5 29...