2
Gentlemen,
thanking you for the preference given to us in choosing and purchasing our boilers, we invite you to carefully read these
instructions concerning the correct installation, use and maintenance of the aforementioned appliances.
We inform the user that:
1. according to the provisions of Law no.46 of 5 March 1990:
• the boilers must be installed by an authorized installation company which is required to strictly
comply with the regulations in force;
• the installation company is required by law to issue the declaration of compliance with the
regulations in force for the installation carried out;
• anyone who entrusts the installation to an unauthorized installation company is liable to an
administrative penalty;
• maintenance of the boilers can only be carried out by qualified personnel, in possession of the
requisites established by current legislation;
2. according to the provisions of Presidential Decree no.74 of 16 April 2013:
• the compilation of the system booklet, after detecting the combustion parameters, must be carried
out by the installing company.
Carefully read the warranty conditions and the advantages offered by the manufacturer and reported on the
inspection certificate attached to the boiler.
The compilation of the inspection certificate by an Authorized Service Center allows you to enjoy the
advantages offered by the manufacturer as specified in the inspection certificate itself.
The completion of the inspection certificate by an Authorized Service Center is FREE.
Pursuant to art. 26 of the Legislative Decree 14 March 2014, n. 49 "Implementation of Directive 2012/19 / EU on waste
electrical and electronic equipment (WEEE)" the crossed-out bin symbol shown on the appliance and on the packaging
indicates that the gas boiler, at the time of its disposal, must be collected and disposed of separately from other waste (see
paragraph END OF LIFE DISPOSAL).
Содержание PLAY 24
Страница 45: ...45 3 6 3 Wiring diagram fig 21...
Страница 52: ......
Страница 53: ......
Страница 55: ...2...