EN - 17
ABIROB
®
A
11 Dismounting
11 Dismounting
Dismounting may only be carried out by specialized personnel. Please make
sure that the shutdown procedures are strictly observed, before the dismounting
work begins. Ensure this also for the components integrated into the welding
system.
1
Disconnect the hose assembly from the wire feed.
2
Remove the parts to be disconnected (changeable body, mount, CAT robot
mount, torch neck).Entsorgung
12 Disposal
For disposal, the local regulations, laws, provisions, standards and guidelines
must be observed. For the welding torch system to be properly disposed of, it
first must be dismounted.
See 11 Dismounting on page EN-17
12.1 Materials
This product consists for the most part of plastics, steel and non-ferrous metals.
Steel and non-ferrous metals can be molten in steel and iron works and are thus
Pore formation
• Strong spattering in the gas nozzle
• Insufficient or missing gas cover
• Air currents blow shielding gas
away
• Clean gas nozzle
• Check gas cylinder contents and
pressure setting
• Shield welding area with partitions
Problem
Cause
Solution
Tab. 8
Troubleshooting
DANGER
Risk of injury due to unexpected start-up.
For the entire duration of maintenance, servicing, dismounting and repair
work, the following instructions must be adhered to:
• Switch off the power supply.
• Cut off the compressed air supply.
• Switch off the entire welding system.
• Pull the mains plug.
NOTE
• Observe the information given in 8 Putting out of operation on
Содержание ABIROB
Страница 19: ...DE 19 ABIROB A 12 Entsorgung ...
Страница 37: ...EN 19 ABIROB A 12 Disposal ...
Страница 55: ...FR 19 ABIROB A 12 Elimination ...
Страница 73: ...ES 19 ABIROB A 12 Eliminación ...