EN - 11
ABIROB
®
A
6 Putting into operation
Check once again whether the wire guide has been fastened correctly.
1
Join the central plug
and the central socket at the wire feed unit and
secure them with a connection nut
2
Fasten the air-blast hose
to the air-blast and spraying unit or the air-blast
valve. Seal the connection gastight if the "Cleaning with compressed air"
option is not used.
6.4 Connect the control line
Fig. 5 Equipping the hose assembly on page EN-10
is open on the machine side. The customer has to provide
the connection of a suitable plug. If all data are provided, the machine can also
be delivered ready-to-connect. Otherwise choose a compatible plug for your
power supply and solder it to the corresponding wires according to the
assignment plan.
6.5 Setting the shielding gas quantity
a = green, b = white, c = brown, d = yellow (insulated), e = grey (insulated), f = blue (insulated),
g = pink (insulated), h = black, i = purple, j = red (insulated)
Fig. 6
Connect the control line
h
i
e
j
2
3
1
a
b
c
f
g
a
b
c
d
e
f
g
h
i
j
C
NO
NC
1
4
2
3
2
1
2
3
1
R 1,2k
D1
d
NOTE
• The type and quantity of the shielding gas quantity depends on the
welding task and the gas nozzle geometry.
• To prevent the shielding gas supply from becoming clogged by
impurities, the cylinder valve must be opened briefly, before connecting
the cylinder. This will blow out any impurities that may be present.
Содержание ABIROB
Страница 19: ...DE 19 ABIROB A 12 Entsorgung ...
Страница 37: ...EN 19 ABIROB A 12 Disposal ...
Страница 55: ...FR 19 ABIROB A 12 Elimination ...
Страница 73: ...ES 19 ABIROB A 12 Eliminación ...