For commissioning you are located in:
Section 1 (Preparing the devices)
Overview of commissioning:
see chapter 4.1 “Overview of commissioning“
on page 30
First address stations IP touch 7" or Guard unit. Addressing is carried out in the same way for
all versions.
Fig. 16: Addressing station IP touch 7" or Guard unit
The wizard is displayed after the device has booted up automatically and will guide you through
the first setup. If the device has already been setup, the main menu is displayed directly.
To address the device, perform the following steps:
1. Follow the steps of the wizard for the first commissioning.
2. Enter the address of the device in the technical menu.
Station IP touch 7" or Guard unit is addressed.
Do not switch station IP touch 7" or Guard unit off or separate them from the other devices.
Содержание Welcome IP
Страница 1: ...System Manual 08 04 2019 ABB Welcome IP ...
Страница 12: ...Overview of product range System Manual 2CKA000073B9795 12 2 3 3 System devices 2 3 4 5 1 Fig 3 System devices ...
Страница 72: ...Case studies System Manual 2CKA000073B9795 72 Fig 50 Connection Multifamily house Switch with PoE and Routing ...
Страница 79: ...Notes System Manual 2CKA000073B9795 79 8 Notes ...