Commissioning
System Manual 2CKA000073B9795
│50
Fig. 31: App: Project export
3. Select the desired project on the smartphone and upload it into system controller "Smart
Access Point".
Fig. 32: System controller: Project selection for project import
4. On system controller "Smart Access Point" select the project to which the devices are to be
added, and confirm the project.
– The upload of the project starts.
– The upload can take several minutes, depending on the scope.
Содержание Welcome IP
Страница 1: ...System Manual 08 04 2019 ABB Welcome IP ...
Страница 12: ...Overview of product range System Manual 2CKA000073B9795 12 2 3 3 System devices 2 3 4 5 1 Fig 3 System devices ...
Страница 72: ...Case studies System Manual 2CKA000073B9795 72 Fig 50 Connection Multifamily house Switch with PoE and Routing ...
Страница 79: ...Notes System Manual 2CKA000073B9795 79 8 Notes ...