
Commissioning
System Manual 2CKA000073B9795
│33
4.2
Physical addresses ― Preparing and addressing devices manually
If the devices have a display, the addressing is carried out on the device itself.
If the devices do not have a display, the addressing is carried out via the indoor station.
4.2.1
Physical addresses ― Preparing addressing
For commissioning you are located in:
Section 1 (Preparing the devices)
Overview of commissioning:
see chapter 4.1 “Overview of commissioning“
on page 30
Fig. 15: Preparation of commissioning
1. Connect the devices to the indoor station via a PoE switch.
– As soon as the devices are supplied with voltage via the PoE switch, the device boots
up automatically.
Содержание Welcome IP
Страница 1: ...System Manual 08 04 2019 ABB Welcome IP ...
Страница 12: ...Overview of product range System Manual 2CKA000073B9795 12 2 3 3 System devices 2 3 4 5 1 Fig 3 System devices ...
Страница 72: ...Case studies System Manual 2CKA000073B9795 72 Fig 50 Connection Multifamily house Switch with PoE and Routing ...
Страница 79: ...Notes System Manual 2CKA000073B9795 79 8 Notes ...