43
SA FEG E A R® MOTOR CONTROL CE NTE R/A RC- R E S I STA NT M ETA L- CL A D CON STRUC TI ON
—
05 All the wires are
shipped tagged and
lugged from the
factory and are ready
to be connected. Place
the wires across the
shipping splits or
wiring Interconnects
like in the green square
that’s shown.
—
06 Place the plastic
cover and connect the
wires according to the
connection diagram.
—
05
—
06
Содержание SafeGear MCC
Страница 2: ... Medium voltage SafeGear Motor Control Center controlling energy for a safe world ...
Страница 28: ...25 SAFEGEAR MOTOR CONTROL CENTER ARC RESISTANT METAL CL AD CONSTRUCTION in mm General dimensions ...
Страница 37: ...INSTALL ATION OPER ATION AND MAINTENANCE MANUAL 34 6 Procedure 4 3 2 1 03 4 3 ...