I N S TA L L AT I O N , O P ER AT I O N A N D M A I N T EN A N C E M A N UA L
4
General
—
Indoor Installation
In order to obtain an optimum installation sequence and ensure high quality standards, site installation of the
MCC should only be carried out by specially trained and skilled personnel.
Metal-clad MCC ships are in sections. These sections group are on disposable steel shipping bases. Equipment
is not to be permanently installed on the shipping bases.
Unload the units as close to the installation site as possible. Remove all drawout elements and secure all doors
and panels. To move the shipping sections to their final position, one of four methods can be used.
Forklift – place forks through locations provided in the shipping bases (see Figures 01 and 02).
Lift the MCC frames slowly and tilt forks slightly rearward to balance. Move carefully into the final position
taking into account the center of gravity (see Figure 04).
Drilling or punching of holes in the equipment in any way will affect the arc- resistant integrity of the MCC.
Consult the factory engineer before proceeding.
WARNING
—
01 Forklift provisions
in shipping channels.
—
02 Forklift forks
penetrating shipping
channels.
—
03 Complete fork
penetration of all 3
shipping channels.
—
04 Lifting of switchgear
frames with forklift.
—
01
—
02
—
03
—
04
Содержание SafeGear MCC
Страница 2: ... Medium voltage SafeGear Motor Control Center controlling energy for a safe world ...
Страница 28: ...25 SAFEGEAR MOTOR CONTROL CENTER ARC RESISTANT METAL CL AD CONSTRUCTION in mm General dimensions ...
Страница 37: ...INSTALL ATION OPER ATION AND MAINTENANCE MANUAL 34 6 Procedure 4 3 2 1 03 4 3 ...