I N S TA L L AT I O N , O P ER AT I O N A N D M A I N T EN A N C E M A N UA L
12
Once installed and all connections made, perform a final check and test on the equipment and its controls.
Check for correct equipment installation and that all connections are complete. Take extreme care to prevent
the controlled equipment (load) from being connected to the system while performing preliminary tests.
Disconnect the line wirings if the line contactors are not in the system according to the connection diagram
supplied with the equipment.
Final inspection
Typical circuit diagram HCV-5HA
Safety precautions
Fig. 6 Standard operation circuit diagram of normally energized type
Putting into service
The contactor or cutout device of the local control power circuit must be opened when is used a separated
control power source.
There are hazards of electrical shocks and/or burns whenever working in or around electrical equipment.
Turn off power of the MCC before performing any inspection or maintenance operations.
Check incoming line terminals to verify that the equipment is de-energized and grounded.
Check outgoing terminals to ensure that no back feed condition exists.
DANGER
DANGER
Содержание SafeGear MCC
Страница 2: ... Medium voltage SafeGear Motor Control Center controlling energy for a safe world ...
Страница 28: ...25 SAFEGEAR MOTOR CONTROL CENTER ARC RESISTANT METAL CL AD CONSTRUCTION in mm General dimensions ...
Страница 37: ...INSTALL ATION OPER ATION AND MAINTENANCE MANUAL 34 6 Procedure 4 3 2 1 03 4 3 ...