I N S TA L L AT I O N , O P ER AT I O N A N D M A I N T EN A N C E M A N UA L
38
—
09 Reinstall all
the bus boots.
—
10 Place the plastic bolts
and tighten them.
—
11 Apply the provided
seal putty around
the inside rim of the
through bus support
in the right frame. Cut
any excess putty.
—
10
—
11
—
12
Seal Puttty
Содержание SafeGear MCC
Страница 2: ... Medium voltage SafeGear Motor Control Center controlling energy for a safe world ...
Страница 28: ...25 SAFEGEAR MOTOR CONTROL CENTER ARC RESISTANT METAL CL AD CONSTRUCTION in mm General dimensions ...
Страница 37: ...INSTALL ATION OPER ATION AND MAINTENANCE MANUAL 34 6 Procedure 4 3 2 1 03 4 3 ...