![ABB RED670 Relion 670 series Скачать руководство пользователя страница 91](http://html.mh-extra.com/html/abb/red670-relion-670-series/red670-relion-670-series_commissioning-manual_3169091.webp)
IEC140000144 V1 EN-US
Figure 16:
Captured synchrophasor data
9.5.2
Verifying the IEEE C37.118/1344 UDP communication
GUID-F0D1117D-3D0F-498F-A00C-242763F8A4E6 v1
After setting both PMU configuration and the UDP client configuration (As
explained in sections
Setting the PMU station communication (PMU Report)
Setting the PMU station communication (PMU configuration)
) and making sure that the Ethernet
communication is set up, click
Connect
on the PMU Connection Tester tool.
IEC140000145-1-en.vsd
IEC140000145 V1 EN-US
Figure 17:
Verifying the UDP communication using PMU Connection Tester
•
Now it should be possible to see the streaming synchrophasor data.
•
Verify the communication by following the same steps as in section
the IEEE C37.118/1344 TCP communication
1MRK 505 378-UEN A
Section 9
Establishing connection and verifying the IEEE C37.118/1344 communication
Line differential protection RED670 2.2 IEC
85
Commissioning manual
Содержание RED670 Relion 670 series
Страница 1: ...RELION 670 SERIES Line differential protection RED670 Version 2 2 IEC Commissioning manual ...
Страница 2: ......
Страница 18: ...12 ...
Страница 36: ...30 ...
Страница 68: ...62 ...
Страница 72: ...66 ...
Страница 108: ...102 ...
Страница 278: ...272 ...
Страница 282: ...276 ...
Страница 288: ...282 ...
Страница 306: ...300 ...
Страница 307: ...301 ...