
2000-OSM, F1
2-37
2. Press the F2 (Subscriber List) soft key to access the VistaNET Subscriber List (see Figure 2-23).
***** VistaNET Subscriber List *****
Command: Previous Next Add Delete
Type: HIU
Primary Address: 0.1.0.100
Secondary Address: 0.2.0.100
Time Out:
7000 ms
This Entry: 1
Total Entries: 3
Exit
Accept
Expand
Escape
& Update
Command
Address
F1
F2
F3
F4
Figure 2-23. SUBSCRIBER LIST SCREEN
3. Cursor to Type field and select server type: HIU, RD (VistaREPORTER), or SD
(VistaSTORAGE).
4. Cursor to Primary Address field and enter the full address of the server that the analytical results
or analyzer events will be sent to first.
5. Cursor to Secondary Address field and enter the full address of the server that is contacted only
when no proper response has been received from the Primary Address within the time limit set in
the Time Out field.
6. Cursor to the Time Out field and enter the time period before the analytical device will switch to
the Secondary Address for services. The time-out period must be entered in milliseconds. Note:
If the HIU time-out period is inadequate for HIU communications with the DCS, the HIU will
automatically modify the analytical device’s Subscriber List.
7. Cursor to the Command field, then cursor to Add.
8. Press the F3 (Accept Command) soft key.
9. Repeat steps 2 through 7 for each Subscriber List entry.
10. When you have completed all entries, press the F2 (Exit & Update) soft key.
Completing the VistaNET Connection
When all entries have been completed and verified, you should perform the following steps to ensure
VistaNET is operating properly.